Memo to File M-77-493 2 April 10, 2001 <br /> Task: Haul water pool fill from edge of pond; dump and spread in Mayflower water pool <br /> Volume: 714,525 cubic yards <br /> Task: Haul and spread topsoil in Mayflower Pond <br /> Volume: 129,066 cubic yards <br /> Task: Install geogrid in Mayflower water pool prior to backfillling <br /> Quantity: 774,400 square yards <br /> The September 1998 DMG cost estimate lists the following earthwork calculation information for <br /> Mayflower tailing area: <br /> Task 65 -Haul water pool fill to edge of Mayflower Pond and dump in temporary stockpile <br /> Volume: 714,525 cubic yards <br /> Task 66 -Haul water pool fill from edge of pond; dump and spread in Mayflower water pool <br /> Volume: 714,525 cubic yards <br /> Task 66a-Haul and spread topsoil in Mayflower Pond <br /> Volume: 129,066 cubic yards <br /> Task 108a-Install geogrid in Mayflower water pool prior to backfillling <br /> Quantity: 774,400 square yards <br /> The foregoing comparison demonstrates that DMG and Climax used identical volumes and areas for <br /> estimating Mayflower tailing reclamation costs. The source of the volume and area quantities is the 4- <br /> 1-94 report complied by Stoller Mining Services Division for the Climax Mine. Section VII.d. of the <br /> Stoller report states that 1,071,788 tons of material are required to complete backfilling in the <br /> Mayflower water pool. Assuming a unit weight of 1.5 tons/cubic yard for the backfill material, the <br /> volume of 714,525 cubic yards used in both the DMG and Climax cost estimates was derived. This <br /> volume of backfilling material is designated for use in the Mayflower water pool. No volumes for <br /> Mayflower beach capping material or Mayflower dam face capping material were provided in the <br /> Stoller report, which states on page 20 that the "Mayflower tailing impoundment was capped during <br /> 1991. This project is complete." Based on this and other statements in the report, and on observations <br /> of the Mayflower capping project that was completed in 1991, DMG did not include line items for <br /> capping of Mayflower beach and dam face in the 1998 cost estimate. Fred R. Banta Inc. and Golder <br /> Associates did not include line items for capping of Mayflower beach and dam face in the 1999 cost <br /> estimate. Hence there is no money in the current bond that can be released based on the elimination of <br /> reclamation liability for Mayflower beach capping as approved with SR-03. <br /> cAwindows\personahchmax mayflower beach capping cost.doc <br />