My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-01-29_INSPECTION - M1977493
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977493
>
2001-01-29_INSPECTION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2021 3:54:55 PM
Creation date
1/31/2013 6:59:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
INSPECTION
Doc Date
1/29/2001
Doc Name
Insp Rpt
From
DMG
To
Climax
Inspection Date
9/26/2000
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ID # OR PROSPECTING ID #: M- 1977 -493 PAGE: 12 <br />INSPECTION DATE: 9 -26 -00 INSPECTOR'S INITIALS: ACS <br />because the actual affected land boundaries for the Mayflower borrow source must be <br />incorporated into the reclamation permit, the borrow area is excluded from the SR -03 <br />approval. <br />Reclamation of the disturbed area designated as C -19 in the 1989 amendment AM -02 was <br />inspected. This area is located to the west of Clinton Reservoir and was originally <br />a borrow pit used during the construction of the reservoir. The overall slope angles <br />measured on the sides of C -19 are approximately 2.75:1. A large stockpile had <br />remained in area C -19 for years following construction of Clinton Reservoir. Most <br />of this stockpiled material was used during the 3 -Dam capping project in 1997, but <br />a remnant of the stockpile was observed in C -19. The C -19 borrow area and stockpile <br />and staging location was seeded following the 3 -Dam capping project. The method <br />employed was direct seeding of the rocky subsoil exposed in the pit with no <br />application of plant growth media. Based on the observations made during this <br />inspection, it could not be concluded that additional cover soil might not be <br />necessary to achieve revegetation performance standards. Based on this observation <br />and the presence of the remnant stockpile, area C -19 is excluded from the SR -03 <br />approval. <br />The Precon Building site and the No. 3 Thickener location are included in the SR -03 <br />application. These reclamation project areas were not inspected on this date, but <br />were inspected on October 24, 2000. The observations made at these locations and a <br />summary of the bond reduction to be made through approval of SR -03 will be included <br />in the 10 -24 -00 inspection report. <br />I & E Contact Address <br />NAME Bryce Romig <br />OPERATOR Climax Molybdenum Company <br />STREET Climax Mine <br />CITY /STATE /ZIP Climax, CO 80429 <br />cc: Carl Mount, DMG <br />
The URL can be used to link to this page
Your browser does not support the video tag.