Laserfiche WebLink
Mr. Jared Dads <br />Lafarge Middle Poudre Combined SWSP <br />January 28, 2013 <br />Page 7of8 <br />9. The water attributable to the 5 shares of the Box Elder Ditch must continue to be diverted in <br />priority at the ditch and then measured back to the Cache La Poudre River. Adequate measuring <br />devices acceptable to the water commissioner must be installed. <br />10. The replacement water, which is the subject of this plan cannot be sold or leased to any other <br />entity. As a condition of subsequent renewals of this substitute water supply plan, the replacement <br />water must be appurtenant to this site until a plan for augmentation is obtained. All replacement <br />water must be concurrent with depletions in quantity, timing, and locations. <br />11. The name, address, and phone number of the contact person who will be responsible for the <br />operation and accounting of this plan must be provided on the accounting forms submitted to the <br />division engineer and the water commissioner. <br />12. Adequate accounting of depletions and replacements must be provided to the division engineer in <br />Greeley (Div1Accounting(a state.co.us) and the water commissioner (Mark Simpson at <br />Mark.Simpsoncstate.co.us) on a monthly basis. Submitted accounting shall conform to the <br />Administration Protocol "Augmentation Plan Accounting, Division One — South Platte River" <br />(attached). <br />In addition, the Applicant shall verify that entities providing replacement water for this plan have <br />included such use on their respective accounting submitted to the Division Engineer. For the <br />duration of this SWSP, those entities are the City of Aurora (Aurora Reuse, WDID 0802593) and <br />the Lake Canal Reservoir Company. <br />13. The exemption from augmentation requirements for pre -1981 areas is tied to the physical location <br />previously identified for East Rigden Pit and may not be re- allocated to other areas of ground <br />water exposure within the gravel pits permit boundaries. <br />14. The amount and location of the dry -up of the irrigated acreage associated with the applicant's 8.5 <br />shares of the Box Elder Ditch was previously documented and approved by the division engineer <br />and water commissioner. To assure that depletions from ground water evaporation do not occur <br />in the unforeseen event, or events, that would lead to the abandonment of the pits included in this <br />SWSP, according to an affidavit dated November 23, 2011, the Applicant dedicated the 5 shares <br />of the Box Elder Ditch as replacement water solely to this SWSP for as long as there are <br />depletions at these gravel pit sites or until such time as another replacement source is obtained. <br />For the purposes of this SWSP, this affidavit will be accepted for the dedication of the <br />shares; however, if the State Engineer determines that a different affidavit or dedication <br />process is necessary to assure proper dedication of the shares, additional information may <br />be required prior to future SWSP approvals. <br />15. This substitute water supply plan may be revoked or modified at any time should it be determined <br />that injury to other vested water rights has or will occur as a result of this plan. Should this supply <br />plan expire without renewal or be revoked prior to adjudication of a permanent plan for <br />augmentation, all use of ground water must cease immediately. <br />16. For any site whose reclamation plan includes a permanent water surface exposing groundwater to <br />evaporation, an application for a plan for augmentation must be filed with the Division 1 Water <br />Court at least three years prior to the completion of mining to include, but not be limited to, long- <br />term evaporation losses. Before this SWSP is renewed for 2014, the Applicant must submit <br />such a plan for the Shields Mine as mining is complete and a groundwater lake has been <br />created. If the Applicant has not submitted a plan for augmentation with the Division 1 <br />Water Court by the 2014 SWSP renewal request, the Applicant must document the specific <br />steps taken and show good -faith diligence in preparing to file a plan for augmentation. <br />