My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-28_REPORT - C1980001 (4)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980001
>
2013-01-28_REPORT - C1980001 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:27 PM
Creation date
1/29/2013 9:47:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REPORT
Doc Date
1/28/2013
Doc Name
2012 Annual Reclamation Report
From
Chevron Mining Inc
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION <br />The purpose of this report is to provide updated information pertaining to the reclamation of the <br />Edna Mine and discuss bond release, affected area, topsoiled and seeded acreage summaries. <br />The previous report, dated January 2012, reported reclamation activities through the end of 2011. <br />This report discusses reclamation data and maintenance activity through the end of 2012. All <br />Summary Tables remain consistent with the 2011 Annual Reclamation Report. <br />The report is divided into several sections including: Colorado Division of Reclamation, Mining <br />& Safety (CDRMS) Annual Reclamation Report for the Year 2012, Reclaimed Land Acreage <br />Summary, and 2012 Maintenance. The Summary Tables provide total acreage for all years of <br />mining and reclamation activity at the mine covered by the Regulations of the Colorado Mined <br />Land Reclamation Board for Coal Mining (effective August 30, 1980). The Exhibits illustrate <br />the location of bond release areas, topsoiled and seeded areas, and all maintenance activity <br />performed in 2012. <br />Bond release SL -10 for phases I, II and III was applied for November 24, 2008, deemed <br />complete by CDRMS on January 5, 2009 and was approved February 1, 2010. SL -10 (Old <br />Tipple Road, Facilities and Ponds) includes 13.3 acres of land that had previously not reached <br />any phase of bond release. <br />Bond release SL -11 for phases II and III was applied for May 13, 2009 and deemed complete by <br />CDRMS on June 29, 2009. SL -11 (West Ridge Area, Moffat Area and Support Facilities Area) <br />includes 1,197.6 acres of land that had previously reached phase I release (SL -2, SL -4 and SL -7). <br />CDRMS postponed a proposed decision until the success of weed control measures and the <br />evaluation of the presence of weeds can be reevaluated. Due to the postponed proposed decision <br />date, and subsequent release date that should occur in 2013, the SL -11 bond release is not <br />discussed in this annual report. <br />YV VVCENGINEERING <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.