Laserfiche WebLink
Susan Burgmaier <br />-5- January 18, 2013 <br />2008 GVB -D8 -A & D9A (TR -23 94) 0.5 <br />2008 GVB -D8 -B (TR -23 90) 0.5 <br />2008 GVB -D8 -C (TR -23 87) 0.5 <br />2008 GVB -B1 -A (TR -32 141) 0.0 <br />Drilled in wide section of road 0.0 <br />2008 GVB -B1 -A1 (MR -58 145) 0.5 <br />2008 GVB -B2 -A aka -B2 -B (MR -55 144) 0.0 <br />Same site as: GVB -WD -2C (PR -05 50) 0.5 <br />2008 GVB -B2 -A1 aka -B2 -A (TR -41 147) 0.5 <br />2008 GVB -B2 -A2 aka - B2 -C (MR -62 152) 0.5 <br />2008 GVB -B2 -B aka - B2 -D (MR -61 151) 0.5 <br />2008 GVB -B3 -A2 aka - B3 -A (TR -41 149) 0.5 <br />2008 GVB -B3 -A1 aka - B3 -B (TR -41 148) 0.5 <br />2008 GVB -B3 -A aka -B3 -C (MR -55 144) 0.0 <br />Same site as: GVB -WD1 -B (TR -21 80) 0.5 <br />2008 GVB -B3 -B aka - B3- D(MR -55 144) 0.0 <br />Same site as: GVB -WDI -A (TR -21 78) 0.5 <br />2008 GVB -4A (MR -67 155) 0.5 <br />2008 GVB -5A (MR -67 155) 0.5 <br />2008 GVB -6B (MR -65 153) 0.5 <br />2008 GVB -6C (MR -65 153) 0.5 <br />2008 GVB -6D (MR -78 161) 0.5 <br />2008 GVB -6E (MR -78 162) 0.5 <br />2008 One West Ridge Road Segments (TR -41) 0.3 <br />2009 No backfill or grading in 2009 0.0 <br />2010 Drill Pad DH- 2010 -2 0.5 <br />2010 One West Ridge Road Segment (TR -41) 0.3 <br />2011 Terror Creek Shaft Pad (TR -47 & 48) 1.2 <br />2011 GVB 8A & 9D (TR -52 176) 1.0 <br />2011 GVB 8 -TG (MR -105 194) 1.0 <br />2011 Dove Gulch east road (TR -52 184) 0.9 <br />2011 HC -08 -01 (TR53 186) 0.5 <br />2011 GVB -7A (MR -78 164) 0.5 <br />2011 FG E Extension (MR -78 170) 0.3 <br />2011 GVB -7B (MR -78 165) 0.5 <br />2011 FG N Ext (MR -78 171) 0.1 <br />2011 GVB -7D (MR -78 167) 0.5 <br />2011 BRL -08 -03 (TR -49 B1 198) 0.5 <br />2011 Pond 7 Road (TR49 B1 201) 0.4 <br />2011 BRL -08 -04 (TR -49 B1 199) 0.5 <br />2011 DH -69 Road (TR49 B1 202) 0.7 <br />2011 Road NR E Branch (MR -78 168) 0.2 <br />2011 Road NR WNW Ext (MR -78 172) 0.3 <br />2011 GVB D9 -B (TR -23 092) 0.5 <br />2011 GVB -10E & 10U -1 (TR -52 180) 1.0 <br />2011 Plantation Extension (TR -52 183) partial 0.1 <br />2011 GVB -D5 -C (TR -20 61) 0.5 <br />2011 Freeman Gulch North Extension (TR -20 23) 0.2 <br />2 Construction of Terror Creek access road re- disturbed 0.5 acres during 2010. Reclaimed acreage reduced from 0.8 to 0.3. <br />