My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-25_INSPECTION - M2012045
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2012045
>
2013-01-25_INSPECTION - M2012045
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:23 PM
Creation date
1/28/2013 3:42:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012045
IBM Index Class Name
INSPECTION
Doc Date
1/25/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
1/11/2013
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Overburden Replace - dozer push <br />Stonewall Springs Quarry Permit Action: <br />Site: Gravel Pit Initial 9.9 AC <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />Initial Volume: <br />Swell factor: <br />Loose volume: <br />002 State: <br />12/21/2012 County: <br />TC1 <br />Agency or organization name' <br />HOURLY EQUIPMENT COST <br />Cat D8T - 8SU <br />310 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />$203.44 <br />$203.44 <br />MATERIAL QUANTITIES <br />19,965 <br />1.000 <br />19,965 LCY <br />$56.69 <br />$107.90 <br />$0.00 <br />$38.85 <br />BULLDOZER WORK <br />DRMS <br />Colorado <br />Pueblo <br />Utilization % <br />NA <br />100 <br />0 <br />NA <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: 150 feet <br />Unadjusted hourly production: 634.3 LCY /hr <br />Materials consistency description: Loose stockpile 1.2 <br />Average push gradient: -25 % <br />Average site altitude: 4,550 feet <br />Material weight: 2,650 lbs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Operator Skill: <br />Material consistency: <br />0.750 <br />1.200 <br />Source <br />(AVG.) <br />(CAT HB) <br />Page 1 of 2 <br />Permit /Job #: M2012045 <br />Abbreviation: None <br />Filename: M045 -002 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.