Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Topsoil Replace - from stockpile <br />Stonewall Springs Quarry Permit Action: <br />Site: Gravel Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />003 <br />12/21/2012 <br />TC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $204.60 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Pueblo <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />State: Colorado <br />Equipment Description <br />Cat 621G <br />NA <br />NA <br />NA <br />NA <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 11,979 CCY <br />Loose volume: 11,979 LCY <br />Initial 9.9 AC <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />2,650 lbs/LCY <br />Decomposed rock - 25% Rock, <br />75% Earth <br />52,800 pounds <br />19.92 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Abbreviation: None <br />15.70 <br />22.00 <br />Average Volume: 18.85 <br />Adjusted Capacity: 18.85 <br />Page 1 of 2 <br />Permit/Job #: M2012045 <br />Filename: M045 -003 <br />Maintenance Eauipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />95 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$52.68 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$113.10 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$38.82 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$204.60 <br />NA <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />1 <br />0 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: <br />$204.60 <br />Support: <br />$0.00 <br />Maint: <br />$0.00 <br />SCRAPER TEAM WORK <br />Task description: Topsoil Replace - from stockpile <br />Stonewall Springs Quarry Permit Action: <br />Site: Gravel Pit <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />003 <br />12/21/2012 <br />TC1 <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Cost Breakdown: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />Total work team cost/hour: $204.60 <br />HOURLY PRODUCTION <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />County: Pueblo <br />- Scraper: <br />- Dozer: <br />Scraper Work Team <br />State: Colorado <br />Equipment Description <br />Cat 621G <br />NA <br />NA <br />NA <br />NA <br />NA <br />MATERIAL QUANTITIES <br />Initial volume: 11,979 CCY <br />Loose volume: 11,979 LCY <br />Initial 9.9 AC <br />COSTShift basis: 1 per day <br />Support Equipment <br />Swell factor: 1.000 <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />2,650 lbs/LCY <br />Decomposed rock - 25% Rock, <br />75% Earth <br />52,800 pounds <br />19.92 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Abbreviation: None <br />15.70 <br />22.00 <br />Average Volume: 18.85 <br />Adjusted Capacity: 18.85 <br />Page 1 of 2 <br />Permit/Job #: M2012045 <br />Filename: M045 -003 <br />Maintenance Eauipment <br />LCY <br />LCY <br />LCY <br />LCY <br />CIRCES Cost Estimating Software <br />