2013-01-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-01-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:23 PM
Creation date
1/28/2013 12:43:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/25/2013
Doc Name
Weekly CQA Report: Week Ending, 1/19/2013.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />Location <br />This Week <br />(tons) <br />Cumulative <br />(tons) <br />Comments <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) is complete. <br />II) Geosynthetics <br />A) Geomembrane <br />amee <br />GCL deployment began on the truck dump pad, below the LOB. Deployed were P -20 thru P -52, <br />a total of 24,000 sf of GCL was deployed on the 18 In addition an Amec field representative <br />observed and confirmed overlap of the panels to be 6 inches, with some bentonite between the <br />overlap. <br />The contractor continued to prepare subgrade and place the 1ft of low vol as bedding for GCL to <br />be deployed next week. We continue to monitor and document the progress. <br />GCL deployment is scheduled for the following week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />Wall #1 <br />Installation of wall components for Mat No.s 30, 31, 32 and 33 was performed. An Amec field <br />representative inspected and approved placed backfill materials when placed, which was <br />determined acceptable per the plans and specifications. Acceptance to begin the installation of <br />wall components for Mat No. 34 was given. <br />An Amec field representative monitored fill material temperatures thru the working shift as <br />needed. The backfill material temperatures were above 32 °F during the shift. <br />Fill temperatures averaged between 33.6 °F and 43 °F thru the week. <br />MEW Weekly Report WE 01.19.2013.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.