January 22,2013 C-2009-087/Peabody Sage Creek Mine JDM <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> N -Availability of Records N -Reclamation Success <br /> NA -Backfill& Grading N -Revegetation <br /> NA -Excess Spoil and Dev. Waste N - Subsidence <br /> N -Explosives NA - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> R -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> N -Other NA - Special Categories Of Mining <br /> NA -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Peabody Sage Creek Mine conducted by Jason Musick of CDRMS. Jen Hunt <br /> of Peabody Energy accompanied the inspection. The weather was clear and cold at the time of the inspection with <br /> snow-cover throughout the mine site. Extraction of coal continues to be idle with only permitted construction <br /> activities ongoing. <br /> HYDROLOGIC BALANCE -Rule 4.05 <br /> Drainage Control 4.05.1,4.05.2,4.05.3; Siltation Structures 4.05.5,4.05.6;Discharge Structures 4.05.7,4.05.10; <br /> Diversions 4.05.4;Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br /> Drainage —Acid and Toxic Materials 4.05.8; Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> The embankments of the Pecoco Pond,Pond 003,the Upper Sump, and the Lower Sump were snow covered at the <br /> time of the inspection with no problems noted. Ponds were frozen with the exception of Pond 002 which was <br /> partially frozen at the time of the inspection. <br /> Ditches and culverts throughout the facilities area were snow covered with no problems noted. <br /> GENERAL MINE PLAN COMPLANCE: <br /> Ongoing activities included the construction and installation of the compressor building and the continued <br /> installation of the propane tank pad. The construction and installation of the million gallon water tank have neared <br /> completion. Coal extraction operations remain idle at the time of the inspection. <br /> Number of Partial Inspection this Fiscal Year: 6 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 2 of 4 <br />