My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-18_REVISION - M2008076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2008076
>
2013-01-18_REVISION - M2008076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:13 PM
Creation date
1/23/2013 3:48:31 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2008076
IBM Index Class Name
REVISION
Doc Date
1/18/2013
Doc Name
SURETY INCREASE SI-01
From
DRMS
To
OPERATOR
Email Name
TOD
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br />Task description: Reclaim Robinson Sons Gravel Pit <br />Site: Robinson Sons Gravel Pit No. 1 Permit Action: M2008076 Permit /Job #: M2008076 <br />PROJECT IDENTIFICATION <br />Task #: 999 State: Colorado <br />Date: 12/10/2012 County: Las Animas <br />User: TOD <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />001 <br />002 <br />003 <br />004 <br />005 <br />006 <br />007 <br />011 <br />Form <br />Used <br />Grade 20 Acres to 3:1 slopes removing high wall <br />Spread Topsoil 4 inches over 20 Acres <br />Spread 6 inches of overburden over 10 acres at the <br />bottom of <br />Final grade of topsoil <br />Water truck <br />Seeding and re- vegetation of 20 Acres <br />Move Equpiment to and from site <br />Rip 10 acres of hard pan <br />DOZER <br />SCRAPER1 <br />DOZER <br />GRADER <br />MISCTRUK <br />REVEGE <br />MOBILIZE <br />RIPPER <br />Fleet <br />Size <br />SUBTOTALS: <br />Task <br />Hours <br />18.25 <br />8.92 <br />24.69 <br />10.27 <br />16.00 <br />40.00 <br />3.33 <br />15.58 <br />137.04 <br />Cost <br />$3,888.60 <br />$4,628.86 <br />$5,260.26 <br />$1,912.00 <br />$ 784.00 <br />$15,373.50 <br />$4,084.61 <br />$3,320.00 <br />$39,251.83 <br />Description <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02% <br />Performance bond: 1.05% <br />Job superintendent: 66.79 hrs <br />Profit: 10.00% <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): <br />Engineering work and /or contract/bid preparation: <br />Reclamation management and /or administration: <br />0.00 <br />4.25% <br />5.00% <br />CONTINGENCY: 0.00 <br />Abbreviation: None <br />Filename: M076 -999 <br />Total = $792.89 <br />Total = $412.14 <br />Total = $3,960.65 <br />Total = $3,925.18 <br />TOTAL 0 & P = $9,090.86 <br />CONTRACT AMOUNT (direct + O & P) = $48,342.69 <br />Total = 0.00 <br />Total = $2,054.56 <br />$2,417.13 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $13,562.56 <br />TOTAL BOND AMOUNT (direct + indirect) = $52,814.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.