Laserfiche WebLink
MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />7,528 <br />10,755 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />CCY <br />LCY <br />Swell factor: 1.429 <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />0.50 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Very hard, smooth, asphalt or concrete, no tire penetration 1.2 <br />Haul Route: <br />Return Route: <br />Haul Time: <br />0.22 <br />Return Tinie: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 764.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />0.16 <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />minutes <br />minutes <br />1.48 minutes <br />634.28 LCY /Hour <br />2 Scraper(s) <br />1,268.55 LCY /Hour <br />1,268.55 LCY/Hour <br />LCY <br />LCY <br />LCY <br />LCY <br />Site Altitude: 7025 feet <br />Scraper <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />190.00 <br />1.00 <br />1.20 <br />2.20 <br />2868 <br />0.22 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />7,528 <br />10,755 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />CCY <br />LCY <br />Swell factor: 1.429 <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />0.50 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Very hard, smooth, asphalt or concrete, no tire penetration 1.2 <br />Haul Route: <br />Return Route: <br />Haul Time: <br />0.22 <br />Return Tinie: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 764.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />0.16 <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />minutes <br />minutes <br />1.48 minutes <br />634.28 LCY /Hour <br />2 Scraper(s) <br />1,268.55 LCY /Hour <br />1,268.55 LCY/Hour <br />LCY <br />LCY <br />LCY <br />LCY <br />Site Altitude: 7025 feet <br />Scraper <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />( %) <br />Roll. Res <br />( %) <br />Total Res <br />( %) <br />Velocity (fpm) <br />Travel Time <br />(min) <br />1 <br />190.00 <br />-1.00 <br />1.20 <br />0.20 <br />2921 <br />0.16 <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />7,528 <br />10,755 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />CCY <br />LCY <br />Swell factor: 1.429 <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />0.50 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Very hard, smooth, asphalt or concrete, no tire penetration 1.2 <br />Haul Route: <br />Return Route: <br />Haul Time: <br />0.22 <br />Return Tinie: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 764.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />0.16 <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />minutes <br />minutes <br />1.48 minutes <br />634.28 LCY /Hour <br />2 Scraper(s) <br />1,268.55 LCY /Hour <br />1,268.55 LCY/Hour <br />LCY <br />LCY <br />LCY <br />LCY <br />Site Altitude: 7025 feet <br />Scraper <br />Push Dozer <br />Source <br />Altitude Adj: <br />1.000 <br />1.000 <br />(CAT HB) <br />Job Efficiency: <br />0.830 <br />0.830 <br />0.830 <br />0.830 <br />(CAT HB) <br />Net Correction: <br />MATERIAL QUANTITIES <br />Initial volume: <br />Loose volume: <br />Material weight: <br />Material description: <br />Rated Payload: <br />Payload Capacity: <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />7,528 <br />10,755 <br />Source of estimated volume: <br />Source of estimated swell factor: <br />HOURLY PRODUCTION <br />1,600 lbs /LCY <br />Top Soil <br />52,800 pounds <br />33.00 LCY <br />CCY <br />LCY <br />Swell factor: 1.429 <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Heaped Volume: <br />Average Volume: <br />Adjusted Capacity: <br />0.50 Minutes <br />0.60 Minutes <br />Travel Time: <br />Road Condition: Very hard, smooth, asphalt or concrete, no tire penetration 1.2 <br />Haul Route: <br />Return Route: <br />Haul Time: <br />0.22 <br />Return Tinie: <br />Total Scraper team cycle time: <br />Adjusted for job conditions: <br />Selected Number of Scrapers: <br />Adjusted single scraper team (unit) hourly production: <br />Adjusted multiple scraper team (fleet) hourly production: <br />Unadjusted unit production/hour: 764.19 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />0.16 <br />15.70 <br />22.00 <br />18.85 <br />18.85 <br />minutes <br />minutes <br />1.48 minutes <br />634.28 LCY /Hour <br />2 Scraper(s) <br />1,268.55 LCY /Hour <br />1,268.55 LCY/Hour <br />LCY <br />LCY <br />LCY <br />LCY <br />Site Altitude: 7025 feet <br />