Laserfiche WebLink
Machine Description <br />Total Cost /hr/ unit <br />Fleet Size <br />Haul Trip <br />Cost /hr/ fleet <br />Return Trip <br />Cost /hr/ fleet <br />Water Tanker, 2,500 Gal. <br />$29.48 <br />1 <br />$29.48 <br />$29.48 <br />Non - Roadable <br />Equipment <br />Roadable <br />E. ui . meat <br />0.83 <br />0.83 <br />0.83 <br />0.83 <br />0.00 <br />NA <br />0.00 <br />NA <br />1.67 <br />1.67 <br />ROADABLE EQUIPMENT. <br />EQUIPMENT HAUL DISTANCE and Time <br />Nearest Major City or Town within project area region: TRINIDAD <br />Total one -way travel distance: 25.00 <br />Average Travel Speed: 30.00 <br />Transportation Cycle Time: <br />Haul Time (Hours): <br />Return Time (Hours): <br />Loading Time (Hours): <br />Unloading Time (Hours): <br />Subtotals: <br />JOB TIME AND COST <br />Subtotals: <br />Total Non - Roadable Mob /Demob Cost * <br />`* two round trips with haul rig: <br />Total Roadable Mob/Demob Cost ** <br />** one round trip, no haul rig: <br />Total job time: <br />$4,035.48 <br />$49.13 <br />Total job cost: $4,084.61 <br />$29.48 <br />$29.48 <br />mph <br />3.33 Hours <br />miles <br />