My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-23_REVISION - M1984076
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984076
>
2013-01-23_REVISION - M1984076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:05:30 PM
Creation date
1/23/2013 2:58:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984076
IBM Index Class Name
REVISION
Doc Date
1/23/2013
Doc Name
TR-02 REQUEST
From
GENERAL SHALE
To
DRMS
Type & Sequence
TR2
Email Name
TAK
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 21, 2013 <br />Colorado Division of Reclamation, Mining, and Safety <br />Mr. Berhan Keffelew <br />Environmental Protection Specialist Hydrogeologist <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: M- 1984 -076 DDD Mine, Elbert County, Colorado <br />TR -2 Inert Fill Import <br />Dear Mr. Keffelew: <br />General Shale Brick, Inc. (GSB) is providing Technical Revision Number 2 (TR -2) which is a notice of <br />intent to backfill inert structural fill, generated outside of the permit area at the DDD Mine in the <br />western pit named DWR Mine per rule 3.1.5.9. We have enclosed a check for the TR fee of $216. <br />Placement of the scrap brick will assist in site reclamation by providing additional fill material as <br />replacement for mined materials. <br />The inert fill material will consist of scrap brick generated from the GSB's Denver brick plant. We <br />anticipate placing 45,000 tons of scrap brick into the pit. An affidavit is attached certifying that the <br />scrap brick mix is inert and "clean ". <br />We plan on hauling the scrap brick and placing it on the clay stockpile pad area (inside the current <br />disturbance boundary). Then when concurrent reclamation begins in 2014 we will place the scrap <br />brick into the pit. We do not anticipate any settling and voids due to the placement of these materials <br />because the materials will be placed in 5 -10 foot lifts, blended with the current overburden materials <br />and compacted. The scrap brick will be hauled starting on or about January 28, 2013 and ending <br />November 18, 2016. <br />These materials will not impact surface water runoff quality, because these materials does not contain <br />contaminants, and local area storm water runoff is diverted away from the mine disturbed area. The <br />scrap brick will not contaminate ground water because it has been fired to a high temperature. <br />Further, these materials will not be placed below the saturated zone. <br />Please feel free to contact me with any questions at 303 - 783 -3058. <br />Sincerely, <br />General Shale Brick, Inc. <br />Jason E. McGraw PE <br />Mine Supervisor <br />Enc: Affidavit and Check for TR Fee <br />General Shale <br />Building The American Dreamy <br />RECEIVED <br />JAN 23 ?013 <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />
The URL can be used to link to this page
Your browser does not support the video tag.