Laserfiche WebLink
January 17, 2013 C-1981-028/Keenesburg Strip Mine BFB <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection R -Roads <br /> R -Availability of Records N -Reclamation Success <br /> R -Backfill &Grading N -Revegetation <br /> N -Excess Spoil and Dev.Waste N - Subsidence <br /> N -Explosives N - Slides and Other Damage <br /> N -Fish&Wildlife N - Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> N -Gen. Compliance With Mine Plan N - Support Facilities Not On-site <br /> N -Other N - Special Categories Of Mining <br /> N -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a complete inspection of the Keenesburg Mine conducted by Brock Bowles of the Colorado Division of <br /> Reclamation, Mining and Safety. Donald MacDonald, Ben Moline and Danny Kipp of Coors Energy Company <br /> were present for the inspection. Weather conditions were clear with no wind. There were some patchy melting <br /> snow and the roads were dry and stable. <br /> AVAILABILITY OF RECORDS—Rule 5.02.4(1): <br /> All the mine records were accessible in the mine office. See the attached records checklist. <br /> BACKFILL and GRADING—Rule 4.1411 Contemporaneous Reclamation 4.14.1;Approximate Original Contour <br /> 4.14.2; Highwall Elimination 4.14.1(2)(f); Steep Slopes 4.14.2, 4.27;Handling of Acid and Toxic Materials <br /> 4.14.3; Stabilization of Rills and Gullies 4.14.6: <br /> Ash was stacked in B-Pit ready for backfilling. The current lift in B-Pit is being backfilled from west to <br /> east(photo 1). <br /> HYDROLOGIC BALANCE -Rule 4.05❑ Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, <br /> 4.05.6; Discharge Structures 4.05.7, 4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; <br /> Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Sediment Pond 2 was dry. There was a small amount of snow in the shadows of the trees (photo 2). The <br /> overflow channel was free of obstructions. The west perimeter ditch was dry and free of obstructions(photo 3). <br /> ROADS —Rule 4.0311 Construction 4.03.l(3)/4.03.2(3)❑ Drainage 4.03.l(4)/4.03.2(4)11 Surfacing and <br /> Maintenance4.03.1(5) and(6)/4.03.2(5) and (6)❑ Reclamation 4.03.1(7)/4.03.2(7): <br /> The main haul road to B-Pit was recently maintained and appeared to be stable. <br /> SIGNS AND MARKERS —Rule 4.02: <br /> Number of Partial Inspection this Fiscal Year: 4 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 4 <br />