My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-17_REVISION - C1981028
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981028
>
2013-01-17_REVISION - C1981028
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:11 PM
Creation date
1/18/2013 8:55:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981028
IBM Index Class Name
REVISION
Doc Date
1/17/2013
Doc Name
Letter & Application
From
Coors Energy Company
To
DRMS
Type & Sequence
MR45
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Denver, Colorado 80203, (303) 866 -3567 RECEIVED <br />Permittee: <br />Street: <br />Brief Description of Revision: <br />APPLICATION FORM FOR A REVISION <br />TO A COAL MINING AND RECLAMATION PERMIT <br />This form must be completed and submitted with all requests for minor revisions, as defined in Rule 1.04(73), <br />technical revisions, as defined in Rule 1.04(136), and permit revisions, as defined in Rule 1.04(90). All revisions <br />are to address the requirements of Rule 2.08.4. Three (3) copies of the revision, including maps, must be <br />submitted in order for it to be complete. <br />All revisions are to be formatted so they can be inserted into the permit to replace the revised sections, maps, <br />tables and /or figures, with a revised table of contents, if necessary. The revision submittal date should be printed <br />in the lower right corner of each revision page. A cover letter to the revision should explain the nature of the <br />revision and reference the specific permit sections being revised. <br />For federal mines, a copy of the revision application must be submitted to all agencies on the federal mailing list <br />(except OSM) at the same time the application is submitted to the Division, and proof of distribution must be <br />submitted to the Division along with the application. Copies of revision pages modified during the review process <br />must be distributed in the same manner, along with proof of distribution. Proof of distribution must be submitted <br />prior to implementation of the revision. <br />Permit No.: C - 1981 - 028 Date: 01 / 11 / 2013 <br />Coors Energy Company <br />P.O. Box 467 <br />City: Golden <br />State: CO Zip Code: 80402 - 0467 <br />Update of Permit Application and Permit text <br />Public Notice Attached: Yes _ No X (Required for PRs and TRs) <br />Bond Increase: Yes No X Federal Non - Federal X Mine <br />Proposed Change in: <br />Permit Area - <br />Disturbed ( + / -) _ _ Q . <br />Permit ( +/ -) _ _ 0 <br />Affected ( + / -) _ _ 0 . <br />Mineral Ownership - <br />Mineral Private ( + / -) _ _ 0 . 0 Acres <br />Mineral Federal ( + / -) _ _ 0 . 0 Acres <br />. Acres <br />0 Acres <br />0 Acres <br />Surface Ownership - <br />Private Land ( + / -) _ _ 0. 0 Acres <br />Federal Land ( + / -) _ _ 0 . 0 Acres <br />State Land ( + / -) _ _ 0 . 0 Acres <br />Mineral State ( + / -) _ _ 0 . 0 Acres <br />JAN 172013 <br />Division of Reclamation, <br />Mining & Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.