Laserfiche WebLink
Land Status Category <br />Last Years <br />Cumulative Total <br />This Calendar Year <br />Cumulative Total <br />Acres disturbed <br />/57.1 — . / <br />0 <br />/6-5 <br />Acres backfilled and graded <br />{ 5. 72 <br />0 <br />q5". 7 2 <br />Acres topsoiled <br />91.27 <br />• 0 <br />qq. 7.7 <br />Address: <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2012. <br />%3ec,,ie I /YJinP <br />mine name <br />C- 8I- 03P) <br />permit # <br />s Ci . ()Laie sooWces £&c. <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of an jr augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed /53 / and the total number of acres: <br />Phase I released /3 . gj Phase II released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N f /y <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 <br />1 (exclude acres where Phase III release has been achieved) <br />0 <br />Phase III released <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative <br />Total <br />This Calendar <br />year <br />Cumulative <br />Total' <br />10 years or <br />less <br />Greater than <br />10 years <br />Acres seeded* <br />/O2. 6 q <br />0 <br />/62,6,9 <br />AA" • G 9 <br />5Lp . C) () <br />Address: <br />Colorado Division of Minerals and Geology <br />Annual Reclamation Report for the Year 2012. <br />%3ec,,ie I /YJinP <br />mine name <br />C- 8I- 03P) <br />permit # <br />s Ci . ()Laie sooWces £&c. <br />Permittee <br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon <br />by the Division. It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report. <br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for <br />each category below. Do not include acres that have achieved final, Phase III release. <br />*include, if necessary, a description of an jr augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed /53 / and the total number of acres: <br />Phase I released /3 . gj Phase II released <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed N f /y <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 <br />Acreage in active mining areas 3 <br />1 (exclude acres where Phase III release has been achieved) <br />0 <br />Phase III released <br />2 Includes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion and <br />collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and construction areas; <br />office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal conveyors; refuse piles and <br />coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and entryways; and noncoal waste disposal area <br />(garbage dumps and coal combustion by- products disposal areas). <br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />