November 30, 2010 <br />Mr. Miguel Hamarat <br />Climax Molybdenum Company <br />Henderson Operations <br />19302 County Road 3 <br />Parshall, CO 80468 <br />Subject: Henderson Mill 1 -Dam Well Field Assessment <br />Dear Mr. Hamarat: <br />On November 9, 2010, I inspected the Dam #1 Well Field at the Henderson Mill. I was <br />accompanied by William Katz of your office. In addition I have reviewed the design report <br />written by URS titled "Phase 1 Extraction Well System at Tailings Dam No.1" dated October <br />15, 2001. The purpose of this inspection was to produce a set of record drawings to reflect <br />existing observed conditions, and to compare the current installation with the report <br />recommendations. <br />Observations from our inspection of the installation and report review are as follows: <br />• The report called for drilling 9 wells with 4" PVC casing and the installation <br />of pumps capable of producing 5 gpm at 50 ft of head. This has been done. <br />• Originally level sensing pneumatic pumps were specified and installed but are <br />being replaced, as needed, with electric pumps. Currently 2 pumps are <br />electric. <br />• The report called for 6 observation wells to be installed after the installation of <br />the extraction wells for monitoring purposes, the locations were not specified <br />in the report. The report called for these wells to be installed after the <br />extraction wells were completed <br />• The installation has 9 monitoring wells drilled adjacent to the extraction wells. <br />These wells will not provide the data required from the observation wells. <br />The observed installation appears to meet the intent of the design report, with the exception <br />of the observation wells. The drawings have been revised to show the monitoring wells, other <br />minor clarifications and are labeled as "Record Drawing ". I have attached copies of these <br />drawings for your files. <br />