My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-15_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2013-01-15_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:07 PM
Creation date
1/16/2013 6:50:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
1/15/2013
Doc Name
Submittal of Constr. Cert. and As-Built Drawings for 1-Dam Wellfield.
From
Climax Molybdenum
To
DRMS
Type & Sequence
TR10
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
November 30, 2010 <br />Mr. Miguel Hamarat <br />Climax Molybdenum Company <br />Henderson Operations <br />19302 County Road 3 <br />Parshall, CO 80468 <br />Subject: Henderson Mill 1 -Dam Well Field Assessment <br />Dear Mr. Hamarat: <br />On November 9, 2010, I inspected the Dam #1 Well Field at the Henderson Mill. I was <br />accompanied by William Katz of your office. In addition I have reviewed the design report <br />written by URS titled "Phase 1 Extraction Well System at Tailings Dam No.1" dated October <br />15, 2001. The purpose of this inspection was to produce a set of record drawings to reflect <br />existing observed conditions, and to compare the current installation with the report <br />recommendations. <br />Observations from our inspection of the installation and report review are as follows: <br />• The report called for drilling 9 wells with 4" PVC casing and the installation <br />of pumps capable of producing 5 gpm at 50 ft of head. This has been done. <br />• Originally level sensing pneumatic pumps were specified and installed but are <br />being replaced, as needed, with electric pumps. Currently 2 pumps are <br />electric. <br />• The report called for 6 observation wells to be installed after the installation of <br />the extraction wells for monitoring purposes, the locations were not specified <br />in the report. The report called for these wells to be installed after the <br />extraction wells were completed <br />• The installation has 9 monitoring wells drilled adjacent to the extraction wells. <br />These wells will not provide the data required from the observation wells. <br />The observed installation appears to meet the intent of the design report, with the exception <br />of the observation wells. The drawings have been revised to show the monitoring wells, other <br />minor clarifications and are labeled as "Record Drawing ". I have attached copies of these <br />drawings for your files. <br />
The URL can be used to link to this page
Your browser does not support the video tag.