Laserfiche WebLink
Collection #1 Initial See Map C -3 for ditch path See Map G -1 B for ditch path Legend <br />10700 Grades Collection #5 Segment 1 Segment 2 Segment 2 (rec) Ditch grade <br />10- 7� Segment 1: 17.2% SWB -8 <br />egment 1 I--- Segment 3 Segment 2: 0.5% 10700 2.41 cfs 10700 �L Water level <br />10650 Segment 2 10650 Segment 3: 7.5% 1 0.75 1 I' 1 .25fti <br />0.50ft. Freeboard <br />'----i I <br />----Segment 4 - Segment 4: 0.5% .oDft.F emam <br />SWB -6 Initial 9 g 10650 Segment 10650 2.00 ft• -� 1.00ft.Frea�board <br />5.61 cfs Grades Triangular Channel ° ft Trapezoidal Channel <br />10600 <br />10600 l Segment 1 o Se ment 2 Equal Side Slopes Equal Side Slopes <br />10600 - 2 % Channel Lining: Pre mine waste rock Channel Lining: Grouted riprap <br />0 0 0 + N N M co v v to m m n w Co rn rn o o g 2: 84% Collection A <br />+ + + + + + + + + + + + + + + + + + + + � r Segment 10600 36" CMP (half) <br />9 <br />0 0 0 0 0 0 0 0 0 0 0 0 0 o SWB -6A Collection ditch A will be installed at a 1.0% <br />0 CD o o to o In o 0 o to o to 4.36 CFS slope down its entire course. <br />+ + + + + + + + + + + + + + p <br />O O r r N N M M � V to to c4 r9 <br />Segment 1 <br />Segment 1 Segment 2 Segment 3 Segment 4 rJL59JL <br />' I r 0.50 ft. Freeboard <br />Min. what. depth = 1.0 ft. 3 �0 JT- <br />°.sat. Freeboard 0.50ft. Freeboard <br />,. °oa� 0.75 ° "- `0.50".Freeboenl See Map C -3 for ditch path <br />.W ft. F °aboard ' 1 , Diversion #1 Initial Triangular Channel <br />2.5o i7a --- -�- T 2.50 T Channel Lining: I Compacted tailings (n= 0.020- 0.025) <br />Triangular Channel Flow Capacity =4.67 cfs <br />°. ". Triangular Channel Triangular Channel Equal Side Slopes Velocity Capacity =2.07 fps <br />Equal Side Slopes Equal Side Slopes Grades SWB -1 Initial <br />Channel Lining: Pre mine waste rock Channel Lining: Pre mine waste rock Channel Lining: Pre mine waste rock 10700 Segment 1: 2.0% 40.51 cfs 10700 <br />36" CMP (half) [ Segment <br />10650 10650 Collection B <br />0 0 0 0 0 0 0 0 0 0 0 0 0 0 C) 0 0 0 <br />0 to o to o to o uo o to o to o to c) to o to <br />O O r r N N M M It � to to m 0 ti ti o Co SWB -6B Collection ditch B will be installed at a 1.0% <br />6.40 CFS slope down it's entire course. <br />Segment 1 <br />Segment 1 <br />Collection #1 Final 0.50ft. Freeboard 0.50 ft. Freeboard <br />See Map G -1 B for ditch path , - - -V -- -- ,.5 ft. T 1 1 T <br />Min. const depth = 1.25 ft . 10 <br />"�`-- .- a- .- a- .- .- -�-a -� <br />3 I 3 3 3 Tdanguler Channel <br />0 ft.� Unequal Side Slopes <br />II Channel Lining: Compacted tailings (n= 0.020-0.025) <br />10750 Riprap distribution: Filter distribution: Base distribution: Velocity Capacity ity 2.7 s <br />10750 Trapezoidal Channel Riprap gradation determined vewclacapaGty= z.e7fps <br />p save° D,re = 2.0 ft. rock D,aa = 12 in. rock D,aa = 4 in. rock using CSU methodology <br />Equal Side Slopes 30 °s Des = 1.7 ft. rock Dar = 10 in. rock Da" = 3.4 in. rock (Simons and Senturk) <br />10700 Channel Lining: 12 inch (Dar) Rock Rip -Rap <br />10700 egment 1 E °s Dre = 1.0 ft. rock D. = 6 in. rock D. = 2 in. rock <br />See the CSU Procedure Designs in Appendix D„ = 0.42 ft. rock Di, = 2.5 in. rock D,a = 0.8 in. rock <br />6 for more information <br />D. Da = 0.1 ft. rock Da = 0.6 in. rock Da = 0.2 in. rock <br />10650 Grades ° egment 2 egmentgE °�' 01`� -- <br />Segment 1:28.6 /° 10650 <br />Segment 2 &3: 0.5% SWB -6A +SWB -6C SWB -6A +SWB -6C +SWB -6D <br />Segment 4: 7.5% 4.36 + 2.06 = 6.42 CFS 4.36 + 2.06 + 3.59 = 10.01 CFS <br />10600 10600 <br />0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />o to o to o to o 0 o to o to o to o to O o o to 0 to o to <br />+ + + + + + + + + + + + + + + + + + + + + + + + <br />See Map G -1 B for ditch path Typical Grouted Channel <br />M M o o 0 o i 0, o o r <br />O O r r Diversion #1 Final <br />(longintudinal view) <br />Segment 1 Se g ment 1 ( rec ) Se g ment 2 Se g ment 3 Segment �' � 10850 10850 10850 a g <br />ment <br />4 in. HOPE drain pipes; located every 30 ft. along channel <br />1.75ft. Freeboard <br />c 1.00ft.Freeboard 11.0011. Freeboard 0.50 <br />0.25 1.25 ft. 0.50ft. Freeboard _ 1 25 ft o.50ft. Freeboard 2,-5!�� -075-ft-.F 10800 ". 10800 1 <br />1 _/1 i 1' I <br />1 Grounted channel <br />.ton F boaN 2. O ft. T -� I��� .5 ft. <br />Trapezoidal Channel SWB -1 Trapezoidal Channel Perforated end <br />10750 32.8 cfs 10750 <br />Equal Side Slopes Equal Side Slopes <br />Channel Lining: routed riprap Triangular Channel <br />9� P P Trian ular Channel Channel Lining: Grouted riprap <br />Triangular Triangular Channel Equal Side Slopes �,. <br />36" CMP (half) Equal Side Slopes Equal Side Slopes Channel Lining: Pre mine waste rock 10700 10700 <br />Channel Lining: Pre mine waste rock Channel Lining: Pre mine waste rock egment 1 6 inches of pipe into the underlying <br />10650 Grades ° 10650 ground; 3 inches protruding from <br />Segment 1:27.2/° channel bottom <br />10600 \ �_ 10600 <br />See Map C -3 for ditch path 10550 10550 <br />Collection #2 Initial <br />Grades 10500 10500 <br />10700 Segment 1: 2.0% SWB -6 Initial 10700 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />o to o to o to o to o to O to o to o to O to <br />5.61 cfs + + + + + + + + + + + + + + + + + + <br />N N co Cl) It V In to W to n 00 Co <br />Segment' <br />10650 10650 <br />0 0 0 0 0 C3 0 0 0 0 0 0 0 0 0 0 <br />o to o to o to o to o to o to o to O to <br />+ + + + + + + + + + + + + + + + <br />O O r r N N to to W I,- Diversion #1 B Final See Map G -1 B for ditch path <br />Segment 1 Segment 11 <br />1.00ft. Freeboard Segment 2 Segment 3 <br />_ � r 1.008. Freeboard <br />0 tJ, 1.00 "' <br />1 <br />10850 10850 t 7 �R card 1 -� <br />0.75fl F050fl. Freeboard <br />per- T ° WB 2 Triangular Channel Triangular Channel <br />Segment 10800 Equal Side Slopes Equal Side Slopes <br />10800 10.6 cis <br />Triangular Channel Channel Lining: Native site material 48" CMP (half) Channel Lining: Native site material <br />Equal Side Slopes <br />Channel Lining: Pre mine waste rock <br />10750 10750 <br />Grades <br />Segment 1:5.0% Segment2 Segment Segment 2 (rec) <br />10700 Segment 2: 45% 10700 <br />Segment 3: 5.0% 1.25ft. Freeboard <br />0.25 ft. <br />10650 10650 4.00 <br />0 0 0 0 0 0 0 0 0 0 0 0 <br />o to o 0 o to o to o to o tgi o Trapezoidal Channel <br />+ + + + + + + + + + + + + <br />0 o r .- N N M M v v to N m Equal Side Slopes <br />Channel Lining: Grouted riprap <br />Segment 1 See Map G -1 B for ditch path See Map G -1 B for ditch path <br />Collection #2 Final 9 Segment 2 Diversion #2 Segment 1 <br />0.50ft. Freeboard <br />1.00ft. Freeboard 10750 39. Bcfs 10750 -- -1 1.7s n. T <br />75 <br />.50 ft . F eboaM �� � / T <br />� �2Z ...555000 <br />° rL Trian Triangular Channel Se ment Triangular Channel <br />9 10700 9 10700 Equal Side Slopes <br />Equal Side Slopes Channel Lining: Native site material <br />10750 SWB -6B + SWB -6E Grades 10750 <br />6.40 + 1.62 = 8.02 cfs Segment 1: 30.3% ( g . 1.0% g• 10650 __, y 10650 <br />Channel Lining: re mine waste roc Grades <br />48 CMP haI Segment 1 <br />\ Segment 2: 7.7% o 0 0 0 0 0 0 0 0 0 0 0 0 0 <br />10700 Segment 1 10700 Segment 1 (rec) o to o to o to o to o to o to o to <br />+ + + + + + + + + + + + + + <br />O O r r N N M M V 7 to to O to <br />i <br />10650 egment 10650 <br />0 50ft 1.25ft. Freeboard <br />O+ + O+ t+ N N 1 1 <br />2.00 ft. _f�9_ <br />Trapezoidal Channel <br />Equal Side Slopes <br />Channel Lining: Grouted riprap <br />Collection #3 See Map G -1 B for ditch path See Map G -1 B for ditch path <br />10750 Diversion #3 Diversion #313 <br />10750 <br />SWB -7A SWB -7A + SWB -713 + SWB -7C 10750 Connection of HDPE drain pipe 10750 <br />1.57 cfs SWB -7A + SWB -7B 10700 <br />10700 f'r 1.57 + 2.49 = 4.06 cfs 1.57 + 2.49 + 5.52 = 9.58 cfs Grades ° JWS 4 <br />e ment 1 Segment 1:1.2% q.3.8 c?: 10700 <br />9 <br />Grades segment 3 10700 Segment 2: 5.0 /0 10700 <br />10650 egment 2 <br />10650 Segment 1: 16.5% -Sege <br />Segment 2: 3.6% Segment 2 <br />�e ment 1 Grades <br />Segment 3: 0.5% 10600 10650 _. _ _ - - -� � - 10650 <br />10600 Segment 1: 4.5% <br />-_ O O O O O O O O O O 0 O O O o to 0 O O <br />0 0 0 0 0 0 0 0 0 0 0 o to + + o to o to + to + to + + + to + + 0 <br />to o �, o o to o to o to o to o 0 to o o o o + + + + t + + t + + + + + + + + + t + 10650 <br />O} }O } t + t t t t t t t t t t t t t t t t $ r � N N O O r r N N M co d' V' to tp (0 O P. h Co Co O <br />r r N N M M to tf1 to to Co Co 0) O O O r r r r <br />O O SWB -5 <br />0 LO <br />Segment 1 Segment 2 Segment 3 0.21 cfs <br />�� g Segment 2 0 0 <br />� "�"`A nil.. �, <br />0.75f� 0.50ft. Freeboard _ <br />125 ft 0.50k. Freeboard <br />1.00ft. Freeboard T Segment 1 <br />0.50 fc- ' \ - T <br />� <br />Triangular Channel Triangular Channel 00° Bib car" <br />T <br />Triangular Channel Equal Side Slopes Equal Side Slopes \ \ " 50 0.50ft. Freeboard <br />Equal Side Slopes Channel Lining: Pre mine waste rock Channel Lining: Pre mine waste rock " \ _ - 1 <br />Channel Lining: Pre mine waste rock 1 T <br />60" CMP (half) 60" CMP (half) Triangular Channel <br />Equal Side Slopes <br />Channel Lining: Native site material <br />See Map G -1 B for ditch path Segment 1 (rec) Segment 2 (rec) <br />Collection #4 Segment 1 <br />0.75ft. Freeboard - n. fl•z' <br />10700 SWB -7D 10700 1 125 ° SOft. Freeboard 1.00r n� <br />4.79 cfs 0.75 ft. 0.50ft. Freeboard` 1 ®-t- 1.50 \I 1. �se -�-J- T <br />10650 - 4.00 ft -1 4.00 ft. fff <br />10650 ; °egment �r 2.50 Trapezoidal Channel Trapezoidal Channel 20336 <br />Grades Triangular Channel Equal Side Slopes Equal Side Slopes <br />10600 Segment 1: 1.5% 10600 Equal Side Slopes Channel Lining: routed ri ra <br />Channel Lining: Pre mine waste rock g' P P Channel Lining: Grouted riprap <br />M�aola -o3e2, � <br />p�M} 43 <br />NOTES: Ditch locations can be seen on Maps C -1, C -2, C -3, G -1, and G -1 B. Figures G-4 and G-4 show culvert and ditch lining standards for the Revenue Mine. Table 6 -1 contains all of the hydraulic calculations for the channel linings shown on the ditch segments REVISIONS BY DATE DES: BL <br />DATE Map G -5: Ditch Designs <br />DRN: BL 11/12/12 Greg Lewicki And Associates p <br />on this map. CHK: GL Revenue Mine <br />APPD:GL SCALE 11541 Warrington Court Phone (303)-346-5196 Star Mine Operations <br />AS SHOWN Parker, CO USA 80138 E -Mail - info @lewo1<i.biz <br />