My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_PERMIT FILE - M2012032 (8)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2013-01-14_PERMIT FILE - M2012032 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:04 PM
Creation date
1/15/2013 3:38:10 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
1/14/2013
Doc Name
MAP G-6
From
GREG LEWICKI
To
DRMS
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Common Features of All Sediment Ponds <br />Emergency Spillway <br />Applies to all Grouted riprap channel linings <br />Spillway lining: <br />Grouted riprap (D-,;o = 0.5 ft) <br />12 inches thick <br />1 <br />2 2 <br />Trapezoidal Channel <br />Equal Side Slopes <br />Channel Lining: Grouted riprap (Dso = 0.5 ft) <br />19 q-5- -; 4 c,,2. ITAK <br />Ex. Baseline Topography <br />'-A <br />� <br />Spill way lining extends 3 ft � w.��. <br />past crest of sideslope on :both C- <br />�-' <br />sides . �► �:�.s <br />21335 <br />Trial <br />Note: Specific pond dimenstions, such as embankment <br />height, top of embankment width, and spillway <br />dimensions, can be found on the appropriate pond <br />design map. See Map G -2 for Sediment Pond 1, Map <br />G -3 for Sediment Pond 2, and Map G -4 for Sediment <br />Pond 3. <br />Notes: R- BY DATq DES <br />DATE <br />DRN 13/12/12 � Greg Lewicki And Associate Map G -6: Embankment Design <br />Revenue Mine <br />=a Star Mine Operations <br />APPD <br />
The URL can be used to link to this page
Your browser does not support the video tag.