My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_REVISION - M1980244 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2013-01-14_REVISION - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:05 PM
Creation date
1/15/2013 7:11:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REVISION
Doc Date
1/14/2013
Doc Name
PSES, Lab Concrete Pad and Liner Exdtension and Growth Medium Noise Berm Extension.
From
CC&V
To
DRMS
Type & Sequence
TR66
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Tim Cazier, DRMS <br />Page 2 <br />concrete pad and appurtenant concrete curb. The demolition cost for this are <br />included in the posting amount of approximately $173,000,000 included in the <br />bond estimate calculation agreed upon by CC &V in letter dated 19 December <br />2012 to the DRMS. <br />b. Concrete pad demolition costs — As mentioned above, Attachment 14 includes a <br />provision for the demolition of the concrete pad. The demolition cost for this are <br />included in the posting amount of approximately $173,000,000 included in the <br />bond estimate calculation agreed upon by CC &V in letter dated 19 December <br />2012 to the DRMS. <br />3) Page 5, Financial Warranty /Attachment 14 — PSES demolition — The bulk of the PSES <br />components may be ultimately recycled. Once detoxified utilizing CC &V's cyanide <br />detox procedures, including washwater confirmation sampling, the materials able to be <br />recycled will be sent to an appropriate recycling facility. The remaining items will be <br />landfilled. <br />4) Attachment 13 — Growth Medium Noise Berm <br />a. Preservation for reclamation — The noise berm(s) will include a small toe berm <br />for interim stormwater control and seeded to facilitate long term stormwater <br />control. <br />b. When the stockpiles will be moved with respect to the proposed mine <br />operations in the Schist Island area — The timing on moving the growth <br />medium noise berm will be toward the very end of the mining cycle within that <br />area. Growth medium or topsoil stockpiles that are more interior to the mining <br />areas will likely be utilized earlier in the mining cycle. <br />Please contact me at (719)- 689 -4055 should you have questions or wish to discuss this request <br />for a technical revision. <br />Sincerely, <br />imm Corner <br />Manager, Environmental Resources <br />/l/ 63 7%.< <br />xc: Sheryl Decker, Acting Teller County Planning Director <br />Byron Hakes, Mayor, City of Victor <br />Attachments Enclosed in Triplicate <br />
The URL can be used to link to this page
Your browser does not support the video tag.