My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-11_PERMIT FILE - P2013002
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2013002
>
2013-01-11_PERMIT FILE - P2013002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:59 PM
Creation date
1/14/2013 4:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013002
IBM Index Class Name
PERMIT FILE
Doc Date
1/11/2013
Doc Name
NOI APPLICATION
From
ENVIRO. ALTERNATIVES
To
DRMS
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />The target area is rugged mountain with minimal topsoil, less than four inches in areas of <br />interest. Drilling in existing mountain trail will not disturb additional forest surface. <br />Overnurcien pusnea to the side aunng surface trenching will be replaces wan the dozer or <br />excavator upon compl of explorat <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />Depending on penetrated material, drill holes will be backfilled with materials removed <br />from the hole and securely plugged. In the event groundwater is encountered, the drill <br />hole wll be plugged wfth cement grout or bentonfte gel as requires by the Rules. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />Upon completion of exploration, the backhoe or dozer will distribute any surface material <br />and grade disturbance to blend with surrounding topography. Seeding and mulching will <br />occur as directed by US BLM. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />BLM does not want to keep the new trail, the surface will be graded to blend with adjoining <br />topography, seeded and mulched as directed by BLM. <br />
The URL can be used to link to this page
Your browser does not support the video tag.