My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-11_PERMIT FILE - P2013002
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2013002
>
2013-01-11_PERMIT FILE - P2013002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:59 PM
Creation date
1/14/2013 4:17:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2013002
IBM Index Class Name
PERMIT FILE
Doc Date
1/11/2013
Doc Name
NOI APPLICATION
From
ENVIRO. ALTERNATIVES
To
DRMS
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Other Disturbances (please describe): <br />F. New Road(s): Length 800.00 (ft) Width 10.00 (ft) <br />Significantly Upgraded Road(s) Length (ft) Width (ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Core hole drilling and trenching will occur within the existing mountain trail as much as <br />possible. Approximately 800 linear feet of new mountain trail may be necessary and <br />approximately 200 feet of trenching. Trenching will occur only in the event outcrop is <br />icier t T t ench w r et nuve over bur der r tuJ del extet tt of r ebet ve <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity 5.00 Average Width 25.00 (ft) Average Length 40.00 (ft) <br />B. Drill Holes: Quantity 15.00 Depth 500 (ft) Diameter 4.00 (th) <br />C. Mud Pits: Quantity 15.00 Average Width 5.00 (ft) Average Length 5.00 (ft) <br />Average Depth 3.0 (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Chemicals will not be used during exploration Diesel fuel will be used in the drill rig <br />Diesel fuel will be hauled to the drill rig as needed by diesel fuel vendor. Exact quantity <br />will depend on drill rig availability in February 2013. <br />No <br />
The URL can be used to link to this page
Your browser does not support the video tag.