Laserfiche WebLink
APPENDIX 6 - STORMWATER CALCULATIONS AND DESIGNS <br />1. Stormwater Basins <br />Below is a listing of the stormwater basins that affect the Revenue Mine. The SCS Runoff calculations, <br />SCS Time of Concentration calculations, and the Graphical Peak Discharge for each stormwater basin <br />can be found in this section. The stormwater basins can be seen on Maps G -1 and G -1B. Map G -1 <br />shows the stormwater basins that drain towards the Revenue Mine, and therefore must be diverted, <br />while Map G -1B shows the stormwater basins at the mine that will be affected by disturbance and <br />therefore must drain to control structures. <br />Revenue Mine August 2012 6 -1 <br />