My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-02_PERMIT FILE - M2013004
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013004
>
2013-01-02_PERMIT FILE - M2013004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:44 PM
Creation date
1/14/2013 3:57:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013004
IBM Index Class Name
PERMIT FILE
Doc Date
1/2/2013
Doc Name
NEED FOR RECLAMATION PERMIT
From
CASILLAS LAW
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TMC/ <br />4. What Happens to the Extracted Material <br />The material will be processed on site to extract any recoverable, marketable minerals. <br />5. What on site use will be made of the extracted material? <br />The waste rock from the extracted material will be used onsite as road fill. <br />6. What is the approximate areal extent of the proposed extraction in acres? <br />Less than 11 acres on all four lode mining claims. <br />7. To what approximate depth will the extraction extend? <br />None beyond the original ground. <br />8. In Cubic Yards, approximately how much material will be removed? <br />100,000 per year. <br />9. Will material extraction result in the use of explosives? <br />No. <br />10. Will the site of extraction result in the exposure of tributary ground water? <br />No. <br />11. Will either the landowner or the mine site operator receive any type of compensation from the proposed material <br />extraction? <br />Compensation is anticipated as part of the extraction. <br />12. Please supply a copy of any documents that will ensure that the area of extraction will be reclaimed to some <br />beneficial land use once extraction activities have been completed. <br />None are available. <br />13. Do you have permits from for this activity from any other governmental agencies? <br />Not at this time. <br />14. Are there state /federal/local agency participants in terms of funding? <br />No. <br />15. What post mining uses will be made of this site of extraction and why? <br />Annexation of the site by Central City is under consideration. <br />16. What types and sizes of equipment will be used in the extraction? <br />Jaw Crusher and Conveyor Belt <br />Yours Truly, <br />By: <br />Teresa M. Casillas, Esq. <br />
The URL can be used to link to this page
Your browser does not support the video tag.