Laserfiche WebLink
Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />107 <br />108 <br />109 <br />110 <br />Onsite disposal of debris <br />DEMOLISH <br />e-, 1-1 1-1 1-1 1-1 1-, I-. 1--1 .--I .--I <br />2.00 <br />$32.85 <br />$6,308.00 <br />$4,378.16 <br />$399.00 <br />$249.84 <br />$411.51 <br />$283.23 <br />$937.00 <br />$9,082.26 <br />$3,694.26 <br />Carry backfill material to pit <br />LOADER <br />66.39 <br />Grade and compact waste rock in pit <br />DOZER <br />20.75 <br />Carry topsoil to pit <br />LOADER <br />4.19 <br />Spread topsoil cover on backfilled pit and <br />disturbed area <br />DOZER <br />1.22 <br />Grade stockpile and process area <br />DOZER <br />2.01 <br />Grade topsoil storage area <br />DOZER <br />1.34 <br />Rip compaction in stockpile and process area <br />RIPPER <br />4.44 <br />Revegetate disturbed areas <br />REVEGE <br />24.00 <br />Haul reclamation equipment to and from site <br />MOBILIZE <br />6.00 <br />SUBTOTALS: <br />132.34 <br />$25,776.11 <br />Task description: Cost summary (recalculated for TR -2) <br />Site: Airport Pit Permit A TR -2 <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />000 State: Colorado <br />1/11/2013 County: San Miguel <br />RCO <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />1.05% <br />30.40 hrs <br />10.00% <br />COST SUMMARY WORK <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legaUrelated costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and /or administration: <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL 0 & P = <br />CONTRACT AMOUNT (direct + O & P) = <br />0.00 <br />0.00% <br />5.00% <br />Total = <br />Total = <br />Permit/Job #: M2011013 <br />Abbreviation: None <br />Filename: M013 -000 <br />$520.68 <br />$270.65 <br />$1,988.46 <br />$2,577.61 <br />$5,357.40 <br />$31,133.51 <br />0.00 <br />$0.00 <br />$1,556.68 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $6,914.08 <br />TOTAL BOND AMOUNT (direct + indirect) = $32,690.19 <br />