My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-14_ENFORCEMENT - C1996083
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1996083
>
2013-01-14_ENFORCEMENT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:12:02 PM
Creation date
1/14/2013 9:35:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
1/14/2013
Doc Name
Notice of Violation
From
DRMS
To
Bill Bear
Violation No.
CV2013001
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2013 -001 <br />NATURE OF VIOLATION: <br />Failure to obtain a technical revision for a modification to the terms or requirements of the permit for design <br />changes for a regulated structure, as required by Rule 2.08.4(2). <br />Failure to obtain final approval before implementing a technical revision, as required by Rule 2.08.4(4). <br />Failure to obtain approval of a performance bond covering the surface acreage to be affected prior to disturbing <br />surface acreage, as required by Rule 3.02.1(2). <br />Failure to save topsoil and subsoils before disturbance of areas affected by surface coal mining operations, as <br />required by Rule 4.06.1(1). <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S): 34 -33 -115, 34 -33 -116; 34 -33- 113(1); 34- 33- 120(2)(e) <br />REGULATIONSECTION(S): 2.08.4(2), 2.08.4(4), 3.02.1(2), and 4.06.1(1) <br />PERMIT SECTION(S): 2.05, page 50; 3.02 <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />1.2 acres of unauthorized disturbance between Gob Pile #2 and Gob Pile #4, as described in the Division's <br />report for the January 9, 2013 inspection of the Bowie No. 2 Mine. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Abatement Step # Description <br />1 Provide all materials necessary to obtain approval for Technical Revision No. 76 to <br />authorize disturbance. <br />2 Post appropriate financial warranty for existing disturbance and any additional proposed <br />disturbance. <br />3 Save all topsoil in accordance with Rule 4.06.2. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step # Due Date <br />1 February 12, 2013 <br />2 Upon final approval of Technical Revision No. 76 — and no later than February 12, <br />2013 <br />3 Upon final approval of TR -76 — and no later than February 12, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.