My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_INSPECTION - C1996083 (7)
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
_INSPECTION - C1996083 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 7:52:01 AM
Creation date
1/14/2013 8:38:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Name
Inspection Report
From
DRMS
To
Bill Bear
Inspection Date
1/9/2013
Email Name
SLB
SB1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 9, 2013 C-1996-083/13owie No. 2 Mine SLB <br /> ENFORCEMENT ACTIONS/COMPLIANCE <br /> Infraction Number: CV2013001 <br /> Inspection Date: January 9, 2013 <br /> Date Issued: January 11, 2013 <br /> Primary Topic: Gen. Compliance With Mine Plan <br /> Secondary Topic: Topsoil <br /> Tertiary Topic: Financial Warranty <br /> Description: <br /> Failure to obtain a technical revision for a modification to the terms or requirements of the <br /> permit for design changes for a regulated structure, as required by Rule 2.08.4(2). <br /> Failure to obtain final approval before implementing a technical revision, as required by Rule <br /> 2.08.4(4). <br /> Failure to obtain approval of a performance bond covering the surface acreage to be affected <br /> prior to disturbing surface acreage, as required by Rule 3.02.1(2). <br /> Failure to save topsoil and subsoils before disturbance of areas affected by surface coal mining <br /> operations, as required by Rule 4.06.1(1). <br /> STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br /> Abatement Step Description <br /> 1 Provide all materials necessary to obtain approval for Technical Revision No. <br /> 76 to authorize disturbance. <br /> 2 Post appropriate financial warranty for existing disturbance and any additional <br /> proposed disturbance. <br /> 3 Save all topsoil in accordance with Rule 4.06.2. <br /> TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br /> ON OR BEFORE last abatement due date <br /> Abatement Step # Due Date <br /> 1 February 12, 2013 <br /> 2 WiUpon final approval of Technical Revision No. 76 — and no later than <br /> February 12, 2013 <br /> 3 Upon final approval of TR-76 —and no later than February 12, 2013 <br /> Number of Partial Inspection this Fiscal Year: 9 <br /> Number of Complete Inspections this Fiscal Year: 2 <br /> Page 6 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.