My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-10_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2013-01-10_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:57 PM
Creation date
1/11/2013 8:18:03 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
1/10/2013
Doc Name
Weekly CQA Rpt.- AMEC Mill Site Earthworks, Wks. Ending 12/22/12 & 12/29/12.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amec <br />recommended not to proceed until acceptable temperatures are met. On Saturday the 29th at <br />approximately 1100hrs it was determined that the average temperature within the already placed <br />within a designated area the average fill temp., was at 32 °F. An Amec field representative <br />approved the materials and informed the contractor the 1St lift can be placed for Mat No. 22 and <br />left with a loose lift during the holiday break within a specified area. The contractor placed the 1St <br />lift within a designated approved area for Mat No. 22 then placed a loose lift and covered with <br />heating elements and blankets for the holiday break. <br />Note; The contractor set up ground thaw heaters and applied blankets to help with the freezing <br />temperatures thru the week. An Amec Field representative monitored wall backfill temperatures <br />during construction. <br />Fill temperatures averaged between 25.5 °F and 32 °F <br />Wall #2 <br />Completed during day shift on Friday December 12.07.12 at approximately 1200 hrs. <br />Wall #3 <br />No work was performed on MSE wall #3. <br />Wall #4 <br />Completed during night shift on November 29/30th <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed DCF placement within the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed overburden fill placement for the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed construction of MSE Wall No. 1. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Samples Obtained <br />DCF — 0 <br />SLF -0 <br />OVF — 1 <br />MWB -0 <br />MWDR — 0 <br />MEW Weekly Report WE 12.29.2012.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.