amec <br />recommended not to proceed until acceptable temperatures are met. On Saturday the 29th at <br />approximately 1100hrs it was determined that the average temperature within the already placed <br />within a designated area the average fill temp., was at 32 °F. An Amec field representative <br />approved the materials and informed the contractor the 1St lift can be placed for Mat No. 22 and <br />left with a loose lift during the holiday break within a specified area. The contractor placed the 1St <br />lift within a designated approved area for Mat No. 22 then placed a loose lift and covered with <br />heating elements and blankets for the holiday break. <br />Note; The contractor set up ground thaw heaters and applied blankets to help with the freezing <br />temperatures thru the week. An Amec Field representative monitored wall backfill temperatures <br />during construction. <br />Fill temperatures averaged between 25.5 °F and 32 °F <br />Wall #2 <br />Completed during day shift on Friday December 12.07.12 at approximately 1200 hrs. <br />Wall #3 <br />No work was performed on MSE wall #3. <br />Wall #4 <br />Completed during night shift on November 29/30th <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed DCF placement within the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed overburden fill placement for the Mill Site Earthworks project, including ambient and fill <br />temperature monitoring when necessary. <br />AMEC observed construction of MSE Wall No. 1. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relations, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />Samples Obtained <br />DCF — 0 <br />SLF -0 <br />OVF — 1 <br />MWB -0 <br />MWDR — 0 <br />MEW Weekly Report WE 12.29.2012.docx <br />