amet� <br />C) Soil Liner Fill (SLF) <br />Soil liner fill placement is complete for the Mill Site Earthworks project. This figure has been <br />removed from the weekly reports. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />D) Drain Cover Fill (DCF) <br />Drain cover fill (DCF) placement performed in the area shown on Figure 2. The DCF was hauled <br />from the processing area to the placement area using 40 -ton articulating haul trucks loaded by a <br />CAT 988 (250703) and a CAT 992 (250601) front -end loader. The DCF was placed in a 2 -foot lift <br />using various CAT dozers except where haul routes were established. Haul routes consisted of <br />four -foot lifts to be spread into 2 -foot lifts later. Laborers were present at all times during <br />placement removing debris /sandbags and assisting the dozer operator with lift thickness. All DCF <br />was placed on previously approved primary geomembrane. AMEC field representatives <br />monitored the DCF placement constantly. <br />Temperatures were monitored by an AMEC field representative prior to fill placement when <br />ambient temperatures were below 32 °F. We informed CC &V and Ames of fill material below 32 °F. <br />Fill temperatures averaged between 27 °F and 34 °F <br />It should be noted that at approximately 1200hrs on December 29th 2012 the placement of the <br />drain cover completed within accordance to the plans and specifications. The figure will be <br />removed from future reports. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />DCF Process <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />Total <br />0 <br />228,613 <br />DCF processing is temporarily paused <br />II) Geosynthetics <br />A) Geomembrane <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />IV) MSE Wall Construction <br />Wall #1 <br />An Amec field representative inspected and monitored temperatures within the existing fill <br />throughout the week and was determined that materials are considered frozen and it was <br />MEW Weekly Report WE 12.29.2012.docx <br />