Laserfiche WebLink
Amec-�, <br />ATTACHMENT A <br />2012 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />MILL SITE EARTHWORKS <br />Name <br />Dec 16 <br />Dec 17 <br />Dec 18 <br />Dec 19 <br />Dec 20 <br />Dec 21 <br />Dec 22 <br />Thorne Clark <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Uwe Kelley <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Dennis Koval <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Ben Melly <br />- <br />LG <br />LG <br />LG <br />LG <br />LG <br />- <br />Robert Redd <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Madison Crouch <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Ryan Fesler* <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Kevin Duarte <br />- <br />LT <br />LT <br />LT <br />LT <br />LT <br />- <br />Jay Moore <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />Ron Arlian <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />*Night Shift <br />■ =1004 10, <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field /Laboratory Manager <br />SE = Senior Engineer <br />MEW Weekly Report WE 12.22.2012.docx <br />