Lagged Depletions from Evaporative Depletions. The timing of stream <br />depletions to Running Creek due to the monthly gross evaporative loss <br />from the Freund Pit was estimated using the Glover methodology. Unit <br />response depletion factors were estimated based on geologic well log <br />information from a nearby well. Using an alluvial transmissivity of 3,000 <br />gallons per day per foot and a specific yield of 0.10, and a distance from <br />the centroid of the Freund Pit to Running Creek of 390 feet, the <br />evaporative depletions from the current size of the pit are estimated to take <br />three months. If the pit is expanded to its potential permitted size of 27 <br />acres, the distance between the centroid of the Freund Pit and Running <br />Creek extends to 690 feet and the lagged evaporative depletions are <br />estimated to take five months. The following table provides a monthly <br />summary of the steady -state equilibrium timing of the post -1980 <br />evaporative depletions to Running Creek for both the current and <br />allowable expanded future pit sizes. <br />Month <br />Current Pit Size 10 acres <br />Expand d Pit Size 27 acres <br />ac -ft/ac <br />ac -ft <br />ac -ft/ac <br />ac -ft <br />November <br />0.22 <br />0.66 <br />0.33 <br />6.60 <br />December <br />0.14 <br />0.42 <br />0.23 <br />4.60 <br />January <br />0.11 <br />0.33 <br />0.16 <br />3.20 <br />February <br />0.12 <br />0.36 <br />0.13 <br />2.60 <br />March <br />0.17 <br />0.51 <br />0.13 <br />2.60 <br />April <br />0.27 <br />0.81 <br />0.19 <br />3.80 <br />May <br />0.38 <br />1.14 <br />0.28 <br />5.60 <br />June <br />0.49 <br />1.47 <br />0.38 <br />7.60 <br />July <br />0.55 <br />1.65 <br />0.47 <br />9.40 <br />August <br />0.54 <br />1.62 <br />0.52 <br />10.40 <br />Se tember <br />0.45 <br />1.35 <br />0.51 <br />10.20 <br />October <br />0.33 <br />0.99 <br />0.44 <br />8.80 <br />Total <br />3.77 <br />11.31 <br />3.77 <br />75.40 <br />Augmentation releases will be based on the lagged evaporative depletions <br />in acre -feet as set forth in the table above. If the pit expands in the future, <br />lagged depletions and augmentation requirements will be calculated by <br />proportionately interpolating between the evaporative depletions for the <br />current pit size and the expanded pit size. <br />(iv) Water Consumption Associated with Mining Operations. Mining <br />operations at the Freund Pit are currently idle. Accordingly, it is not <br />necessary at this time to make augmentation releases in order to account <br />for water removed with the gravel materials or to replace ground water <br />Freund Investments, LLC <br />Case No. 11 CW107, Water Division 1 <br />Page 4 of 8 <br />