Laserfiche WebLink
Mr. James S. Witwer <br />September 12, 2012 <br />Page 2 <br />relieve the Applicant from the requirement to obtain a water court approved plan for augmentation to replace <br />depletions to the stream system in time, place and amount. In addition, adequate measuring devices <br />acceptable to the water commissioner must be installed to ensure the Porter Ditch is diverted in priority and <br />water is properly delivered to offset evaporation from the other ponds. <br />If you have any questions in this matter, please contact loana Comaniciu of this office (303 -866- <br />3581). <br />Sincerely, <br />Heidi Frey .E. <br />Water Resource Engineer <br />cc: Steve Witte, Division Engineer <br />Bill Tyner, Assistant Division Engineer <br />Brian Sutton, Water Commissioner District 12 <br />HCF /IDC <br />