My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-09_INSPECTION - M2007069
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007069
>
2013-01-09_INSPECTION - M2007069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:54 PM
Creation date
1/9/2013 3:34:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007069
IBM Index Class Name
INSPECTION
Doc Date
1/9/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
9/27/2012
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br />Task description: Grade site to 3H: IV slopes <br />Site: Pheasant Run Gravel Pit Permit Action: SO -01 <br />PROJECT IDENTIFICATION <br />Task #: 03A State <br />Date: 1/8/2013 County <br />User: TC 1 <br />Colorado <br />Pueblo <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D8T - 8SU <br />Horsepower: 310 <br />Blade Type: Semi - Universal <br />Attachment: 3 -shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br />Page 1 of 2 <br />Permit/Job#: M2007069 <br />Abbreviation: None <br />Filename: M069 -03A <br />Total unit Cost/Hour: $217.15 <br />Total Fleet Cost/Hour: $217.15 <br />MATERIAL QUANTITIES <br />Initial Volume: 27,733 <br />Swell factor: 1.125 <br />Loose volume: 31,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1,170.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />-5% <br />4,400 feet <br />Material weight: 2,6501bs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />Utilization % <br />Ownership Cost/Hour: <br />$63.00 <br />Dozing method: 1.000 <br />NA <br />Operating Cost/Hour: <br />$107.90 <br />100 <br />Ripper op. Cost/Hour: <br />$7.40 <br />100 <br />Operator Cost/Hour: <br />$38.85 <br />NA <br />Total unit Cost/Hour: $217.15 <br />Total Fleet Cost/Hour: $217.15 <br />MATERIAL QUANTITIES <br />Initial Volume: 27,733 <br />Swell factor: 1.125 <br />Loose volume: 31,200 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production: <br />65 feet <br />1,170.3 LCY/hr <br />Materials consistency description: Consolidated stockpile 1.0 <br />Average push gradient: <br />Average site altitude: <br />-5% <br />4,400 feet <br />Material weight: 2,6501bs/LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor <br />Source <br />Operator Skill: 0.750 <br />(AVG.) <br />Material consistency: 1.000 <br />(CAT HB) <br />Dozing method: 1.000 <br />(GEN.) <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.