My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-01-09_REVISION - M2007069
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2007069
>
2013-01-09_REVISION - M2007069
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:26 AM
Creation date
1/9/2013 3:27:33 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007069
IBM Index Class Name
REVISION
Doc Date
1/9/2013
Doc Name
FW INCREASE
From
DRMS
To
OPERATOR
Type & Sequence
SI1
Email Name
TC1
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Financial War <br />Site: Pheasant Run Gravel Pit <br />COST SUMMARY WORK <br />Estimate for SO -01 <br />Permit Action: SO -01 Permit/Job #: M2007069 <br />PROJECT IDENTIFICATION <br />Task #: OOA State: Colorado <br />Date: 1/912013 County: Pueblo <br />User: TCI <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: M069 -OOA <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />03A <br />04A <br />05A <br />06A <br />Grade site to 311: IV slopes <br />DOZER <br />1 <br />1 <br />1 <br />1 <br />55.31 <br />$12,010.94 <br />$41,391.57 <br />$5,647.73 <br />$3,612.49 <br />Revegetate Maximum Disturbed Acreage <br />REVEGE <br />0.00 <br />Replace average of 3" of topsoil <br />DOZER <br />26.01 <br />Mobilize/Demobilize Equipment <br />MOBILIZE <br />4.60 <br />SUBTOTALS: <br />85.92 <br />$62,662.73 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />Performance bond: <br />Job superintendent: <br />Profit: <br />2.02% <br />Total = <br />$1,265.79 <br />1.05% <br />Total = <br />$657.96 <br />0.00 hrs <br />Total = <br />$0.00 <br />10.00% <br />Total = <br />$6,266.27 <br />TOTAL O & P = <br />$8,190.02 <br />CONTRACT AMOUNT (direct + O & P) = <br />$70,852.75 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal /related costs): 500.00 <br />Engineering work and /or contract/bid preparation: 0.00% <br />Reclamation management and /or administration: 5.00% <br />CONTINGENCY: 0.00 <br />Total = 500.00 <br />Total = $0.00 <br />$3,542.64 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $12,232.66 <br />TOTAL BOND AMOUNT (direct + indirect) = $74,895.39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.