My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-31_REVISION - C1991078
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1991078
>
2012-12-31_REVISION - C1991078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:44 PM
Creation date
1/9/2013 2:09:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
REVISION
Doc Date
12/31/2012
Doc Name
Response to Phase III Bond Release
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
SL3
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A11 =j <br />Form No. <br />GWS -25 <br />APPLICANT <br />OFFICE OF THE STATE ENGINEER <br />COLORADO DIVISION OF WATER RESOURCES <br />818 Centennial Bldg., 1313 Sherman St., Denver, Colorado 80203 <br />(303) 866 -3581 <br />REAMS CONSTRUCTION CO <br />PO BOX 106 <br />NATURITA, CO 81422 -0106 <br />(970) 865 -2886 <br />PERMIT TO USE AN EXISTING WELL <br />APPROVED <br />Receipt No. 3656612B <br />J�4 <br />State En neer <br />WELL PERMIT NUMBER 289222 <br />DIV. 4 WD60 DES. BASIN MD <br />DATE ISSUED 08 -27 -2012 <br />EXST <br />APPROVED WELL LOCATION <br />MONTROSE COUNTY <br />NE 1/4 NW 1/4 Section 29 <br />Township 46 N Range 15 W New Mex P.M. <br />DISTANCES FROM SECTION LINES <br />300 Ft. from North <br />2500 Ft. from West <br />Section Line <br />Section Line <br />UTM COORDINATES (Meters,Zone:13,NAD83) <br />Easting: Northing: <br />ISSUANCE OF THIS PERMIT DOES NOT CONFER A WATER RIGHT <br />CONDITIONS OF APPROVAL <br />1) This well shall be used in such a way as to cause no material injury to existing water rights. The issuance of this permit <br />does not ensure that no injury will occur to another vested water right or preclude another owner of a vested water right from <br />seeking relief in a civil court action. <br />2 ) The construction of this well shall be in compliance with the Water Well Construction Rules 2 CCR 402 -2, unless approval <br />of a variance has been granted by the State Board of Examiners of Water Well Construction and Pump Installation <br />Contractors in accordance with Rule 18. <br />3 ) Approved pursuant to CRS 37- 92- 602(3)(b)(I) for uses as described in CRS 37- 92- 602(1)(f). Use of this well is limited to <br />monitoring water levels and /or water quality sampling. <br />4) Approved for the use of an existing well. <br />5) This well must be equipped with a locking cap or seal to prevent well contamination or possible hazards as an open well. <br />The well must be kept capped and locked at all times except during sampling or measuring. <br />6) Records of water level measurements and water quality analyses shall be maintained by the well owner and submitted to <br />the Division of Water Resources upon request. <br />7 ) Upon conclusion of the monitoring program the well owner shall plug this well in accordance with Rule 16 of the Water <br />Well Construction Rules. A Well Abandonment Report must be completed and submitted to the Division of Water <br />Resources within 60 days of plugging. <br />8) The owner shall mark the well in a conspicuous place with the well permit number and name of aquifer as appropriate, <br />and shall take necessary means and precautions to preserve these markings. <br />9) This well must have been constructed by or under the supervision of a licensed well driller or other authorized individual <br />according to the Water Well Construction Rules. <br />10) This well must be located not more than 200 feet from the location specified on this permit. <br />NOTE: Issuance of this permit does not guarantee that this well can be converted to a production well under a future <br />permit. Additionally, pursuant to Rule 14.2 of the Water Well Construction Rules (2 CCR 402 -2), monitoring holes <br />constructed pursuant to a monitoring hole notice shall not be converted to a production well. (Upon obtaining a permit from <br />the State Engineer, a monitoring hole may be converted to a monitoring well, recovery well for remediation of the aquifer, or <br />a dewatering system for dewatering the aquifer.) -- 9.2.1 tt <br />By <br />EXPIRATION DATE ff <br />
The URL can be used to link to this page
Your browser does not support the video tag.