Laserfiche WebLink
p�U <br />l RFO <br />O <br />p <br />FOO <br />(SoR <br />fAft _ Fq <br />0 100 200 400 <br />SCALE- I" = 200' <br />CONTOUR INTERVAL = 20 FEET <br />LEGEND <br />5800 <br />CONTOUR LINE <br />PROPOSED PERMIT BOUNDARY <br />ORIGINAL PERMIT BOUNDARY <br />STREAM FLOWLINE <br />EXISTING SURFACE ROADS <br />PROPOSED FEATURE <br />FIGURE E3 <br />REVISE PER COMMENTS 11/12/2012 RLC 9/20/2012 • 2350 G Road COTTER CORPORATION <br />REVISION QQ DATE DRAWN BY DATE <br />REVISION ® DATE DESIGNED BY DATE O'fnnnor 10esi n rou Inc• Grand Junction, Co. 81505 <br />PMO DATE 9/20/2012 p1 Phone: (970) 241 -7125 SR-13A MINING PLAN <br />REVISION ® DATE CHECKED BY Fax: (970) 241 -7852 SHEET 1 OF <br />