Laserfiche WebLink
Climax Mine <br /> 1998 Reclamation Report <br /> Highway Frontage/ Buffehr's Lake Reclamation Specifics <br /> Figure B <br /> See Attached Map <br /> Revegetation <br /> Total Acreage Involved Approx. 10 <br /> Stage of Reclamation Acres Remarks <br /> Graded 0 <br /> Backfilled 0 <br /> Seeded 0 <br /> Fertilized 0 <br /> Topsoiling 0 <br /> Liming 0 <br /> Shrub Planting 10 Buffehr's-Salix(200), Picea(400), Populus(300). E-Dump-Picea(220), Populus(220) <br /> Mulched 0 <br /> All work indicated above is ahead of the Climax Reclamation Timetable(1989 Amendment) <br />