Laserfiche WebLink
Climax Mine <br /> 1998 Reclamation Report <br /> 3-Dam Reclamation Specifics <br /> Figure C <br /> See Attached Map <br /> Revegetation <br /> Total Acreage Involved Approx. 16 <br /> Stage of Reclamation Acres Remarks <br /> Graded 0 <br /> Capped 0 <br /> Borrow pits 0 <br /> Seeded 0 <br /> Fertilized 0 <br /> Shrub Planting 16 Area C19-Picea(200).W.3-Dam Borrow-Salix(180), Populus(1700),Picea(200) <br /> Mulched 0 <br /> All work indicated above is ahead of the Climax Reclamation Timetable(1989 Amendment) <br />