Laserfiche WebLink
Climax Mine <br /> 1994 Reclamation Report <br /> Eagle Park Reservoir Tailing Removal Specifics <br /> TR-005 (1993) <br /> Report Map DMG-94-AR-3 <br /> Areas F-4 and associated interim reclamation areas (1989 Permit Amendment) <br /> Total calculated tailing to be removed- 1,187,000 yd"3 <br /> Total tailing removed in slurry pumping operation, 1994- 259,000 yd" , 21% <br /> Remaining tailing to be removed by truck haul beginning March, 1995 <br /> This information will be presented in a separate letter as it is a 1995 operation <br />