Laserfiche WebLink
Cyprus Climax Metals Company <br /> Climax Mine <br /> Highway 91 <br /> CC <br /> �MA CLIMAX Climax,Colorado 80429 <br /> Metals Company (719)486-2150 <br /> Fax: (719)486-2251 <br /> March 1, 1995 <br /> MAR 0 6 1995 <br /> Certified Mail No. P 720 678 782 <br /> �iVISIQ'���' ivsl�iF�;�115��.,iCOluCl <br /> Colorado Division of Minerals and Geology <br /> 1313 Sherman Street <br /> Room 215 <br /> Denver, CO 80203 <br /> RE: MLRD Permit No. M-77-493 112 Annual Report <br /> To Whom it May Concern: <br /> Enclosed is the 1994-1995 112 Annual Reclamation Report for the <br /> Climax Mine and a check in the amount of $550. 00 for permit fees. <br /> I have also attached three maps with narrative information on <br /> three locations where our activities in 1994 related to land <br /> rehabilitation and land reclamation. <br /> The year 1994 saw a significant swing in the value and marketing <br /> potential of the molybdenum reserves at Climax. Climax will <br /> resume operations in the open pit in 1995. Climax will operate <br /> on a two year plan with contingencies for longer term production <br /> based on market conditions. <br /> Due to the Demand Side Management (DSM) program instituted for <br /> energy savings by the Public Service Company, Climax reviewed <br /> water routing, pump relocation, and lime treatment efficiency. <br /> Among other projects conducted under DSM, the pumping facilities <br /> on the 600 level of the underground workings were removed thereby <br /> inundating the level. This activity was inspected and cleared by <br /> the DMG on an October 17 inspection. Included in this report is <br /> a summary of pollution prevention measures for the handling of <br /> water as it rises in 5-Shaft. This includes monitoring of an <br /> established well and in an area below the shaft for seeps. Pump <br /> station establishment will be discussed in the Climax <br /> Environmental Protection Plan. <br /> Reclamation at Climax in 1994 centered on three primary <br /> locations. Building demolition and site cleanup of the <br /> underground support facilities in the Storke Yard is nearly <br /> complete. Robinson Tailing Pond was capped with material from <br /> the East Ore Stockpile for both dust control and revegetation. <br /> At Eagle Park Reservoir, Climax began tailing removal as <br /> specified in TR-005. Reclamation activities in 1995 will extend <br />