Laserfiche WebLink
5 -Shaft Seep Monitoring Report <br />The attached two reports are specific to seep monitoring requirements of the Climax Reclamation <br />Permit following inundation of the underground 600 level on December 14, 1994. A map derived <br />from aerial photos was submitted on March 4, 1995 with the 1994 Annual Reclamation Report. <br />The attached reports are pre- and post initiation of pumping at the 5 -Shaft Pumping Station. Note <br />that "seep" 1 (A and B), the French Drain, is a constructed drainage form the Stroke Crusher. <br />Seep 2 refers to piped conveyance draining the debris disposal area hooked into the plumbing <br />from the now demolished Storke Office and Dry Building. <br />There were no new seeps identified following initiation of pumping at the 5 -Shaft Pumping Station <br />on July 13, 1995. <br />