My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-03-04_REPORT - M1977493 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
1998-03-04_REPORT - M1977493 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2021 8:49:08 AM
Creation date
1/9/2013 7:09:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
3/4/1998
Doc Name
Annual Fee/Report/Map
From
Climax
To
DMG
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C I CLIMAX MOL`r _ -)ENUM COMPANY �. <br /> A Division of Cyprus Climax Metals Co. 999 ,n Mill1 9302 County Road S3 <br /> Parshall, Colorado 80468 <br /> Metro (3031 271-0107 <br /> Out of State (303) 569-3221 <br /> Fax (970) 725-0038 <br /> February 17, 1998 <br /> Ms. Lori Tucker <br /> Biosolids Management Program <br /> CDPH&E, Water Quality Control Division <br /> WQCD-PE-B2 I <br /> Denver, Colorado 80246-1530 <br /> RE: 1997 Biosolids Annual Report- Climax Molybdenum Company <br /> Dear Ms. Tucker: <br /> Enclosed is the 1997 Annual Biosolids Report for the Climax Molybdenum Company's <br /> Robinson Tailing Site. Based on conversations with you, our submission includes General <br /> Facility Information, Land Application Site Information, Cumulative Loadings, and the <br /> Biosolids Application Summary. Also attached is the required certification statement. All other <br /> pages in the annual report are marked"See Producers Reports"to prevent redundancy of <br /> information. <br /> For items (A) and (B) on the Report Contents page, please see the producers reports. Item (C), <br /> soil analyses, is not included as soil monitoring is not required until after the first season of <br /> growth. Item (D), additional monitoring, is not included as no addition monitoring is required. <br /> 1997 was the first year of biosolids application at Climax. Climax saw the application of 111.95 <br /> tons of biosolids and seeding to approximately 4 acres on the Robinson Tailing Site. The <br /> biosolids were applied in August and September. The remaining biosolids, 113.59 tons, are in <br /> staging for future use at the site. Their deposition was delayed due to the onset of inclement <br /> weather. <br /> Biosolids received by the Climax Mine are mixed with wood chips and then spread by truck and <br /> grader at the Robinson Tailing Site. The biosolids and wood chips provide an organic base over <br /> the rock capped tailing pond and assist in reclamation of the site. <br /> Please don't hesitate to call me at(719)486-2150, extension 724, if you have any questions or <br /> are in need of any further information. <br /> Very truly yours, <br /> "'t /234,5,t� <br /> Erich Bower <br /> Environment Engineer <br /> Enclosures <br /> cc: Mr. Robert Brobst- EPA <br /> Co-permittees <br /> r le- CDPy <br />
The URL can be used to link to this page
Your browser does not support the video tag.