Laserfiche WebLink
1997 Reclamation Report <br /> Other Reclamation Activities/Monitoring <br /> Analytical results for PCB Sampling in the Arkansas Basin (1st, 2nd, 3rd, &4th Quarter Sampling) <br /> None detected <br /> 5-Shaft Seep Monitoring Area monitoring results <br /> No substantive changes over 1996 Results <br /> Monitored on June 30 and September 24, 1997 <br /> Eagle Park tails haul road <br /> Road was obliterated and regraded to include a rip rapped drainage channel <br /> Approximately 2 acres was reseeded and received diffuse tree and shrub planting <br /> Environmental Protection Facilities <br /> Constructed 5-Dam pumpback line to 3-Dam <br /> Robinson Lake seep cut-off wall maintenance <br /> 4-Dam seep pumpback line to Robinson Lake <br /> Collection of seeps at 1-Dam to Warren's PS <br />