My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-02-20_REPORT - M1977493
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
1990-02-20_REPORT - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 12:09:55 PM
Creation date
1/9/2013 7:08:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
2/20/1990
Doc Name
Annual Report
From
Climax
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• III I II I II I II IIII III <br /> 999 <br /> Permi ttee Name: Climax Molybdenum Company <br /> Permit No: M-77-493 A41NFt) tAJ <br /> Operation Name: Climax Mine �4EC;L.*':-,#IA ;r N #3IVlC l"�,j <br /> Anniversary Date: 03/04/90 <br /> Please return this form with your completed Annual Report, map, and a <br /> check or money order for annual fees due, payable to the Colorado Mined Land <br /> Reclamation Division, 1313 Sherman Street, Room 215, Denver, Colorado 80203. <br /> ANNUAL REPORT: <br /> Considerable reclamation oriented activities occurred at the Climax <br /> Mine during 1989. The permit and reclamation plan was formally <br /> amended and approved by the Board in October following several <br /> years of work. The affected area was remapped and timelines were <br /> changed to reflect the "swing producer" status of the operation. <br /> Mining activity resumed in the underground portion of the mine and <br /> continued into 1990. Climax will produce and mill ore as the <br /> market dictates. The financial warranty was reduced from $25 million <br /> to $18, 600, 000 as approved by the Board. <br /> Reclamation work at the site focused on general completion of the <br /> activities in ' the Arkansas drainage, completion of the haul road <br /> overpass allowing trucks access to the Robinson tailing pond, and <br /> initiation of capping of the Mayflower tailing dam and beach area <br /> with growth medium obtained from an adjacent barrow site. <br /> Topsoiling was completed in the Arkansas area and newly topsoiled <br /> areas were seeded with the Climax mix. Willow cuttings were planted <br /> in the upper portion of this site to assist in stabilizing the river <br /> channel . Seeding from 1988 and 1987 showed excellent success . Additional <br /> minor work will take place in 1990 in this area. <br /> Approximately 95% of the Mayflower tailing dam and 90% of the beach <br /> area of the Mayflower tailing pond were covered with 12-24 inches of <br /> material excavated from the adjacent borrow area. This material is <br /> a sandy loam with an organic matter content of 2. 8"o. During 1990, <br /> this area will be amended and seeded with the standard Climax <br /> technology. In addition, reclamation test ' pl6ts'will be established <br /> as per the amended reclamation plan. <br /> f/41-- <br /> �:7 <br /> ture Jeff ey W. Todd, Manager, Environmental Assessment <br /> AMA Inc. , Environmental Affairs <br />
The URL can be used to link to this page
Your browser does not support the video tag.