My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1992-03-10_REPORT - M1977493 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1977493
>
1992-03-10_REPORT - M1977493 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2021 3:08:17 PM
Creation date
1/9/2013 7:08:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REPORT
Doc Date
3/10/1992
Doc Name
Annual Fee/Report/Map
From
Climax
To
MLRD
Permit Index Doc Type
Annual Fee/Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLIMAX MOLYBOEI .,JM COMPANY <br /> Climax Mine A unit of AMAX Inc. <br /> March 3, 1992 <br /> �r <br /> MLRD-- Certified Mail No. : P 720 678 846 1AR 1 0 199% <br /> Colorado Mined Land Reclamation Division Mined Land <br /> 1313 Sherman Street t ^� <br /> Room 215 <br /> Denver, CO 80203 <br /> RE: MLRD Permit No. M-77-493 <br /> Gentlemen: <br /> Enclosed is the 1991-1992 Notice of Intent to Continue Mining 112 Annual <br /> Report, and a check in the amount of $430.00 for the 1992 annual fee for <br /> the Climax Mine. In addition, three maps detailing work performed during <br /> 1991 are attached. <br /> The Climax Mine exhausted the ore reserves of the Storke Level in 1991 , and <br /> production ceased in May. The underground facilities are being retained <br /> for future development of the lower levels, and the underground mine water <br /> pump and ventilation systems are still in use, and are being maintained. <br /> Near term production is scheduled from the open-pit mine, however, the <br /> Climax Mine has had no production since May of 1991 . It is currently <br /> estimated that production should resume during the last quarter of 1992. <br /> During the shutdown phase, the milling circuit was upgraded, and a 90 day <br /> limited production performance evaluation of the milling circuit will <br /> commence on April 1 . <br /> Reclamation efforts during 1991 were again concentrated on recontouring and <br /> rock facing of the No.1 Tailing Dam. This work was observed and inspected <br /> by the Colorado MLRD specialists on two separate occasions. Because of the <br /> recent downsizing of the Climax Mine facilities, several structures not <br /> necessasry for future production were demolished, and site restoration will <br /> continue during 1992. <br /> The spreadsheet which was the basis for the 1989 permit amendment has also <br /> been updated to reflect status changes of several areas. The Grading/Site <br /> Preparation and Revegetation Information has not changed from the original <br /> 1989 spreadsheet, and was not included in the revision. Only modifications <br /> to the Affected Areas and relevant Costing data are included. A copy of <br /> the revised spreadsheet is attached. <br /> Climax, Colorado 80429 Phone: (719) 486-2150 Telecopier Ext. 540 <br />
The URL can be used to link to this page
Your browser does not support the video tag.