My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-08-04_PERMIT FILE - P2011026
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011026
>
2011-08-04_PERMIT FILE - P2011026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:36:32 PM
Creation date
1/9/2013 7:08:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011026
IBM Index Class Name
PERMIT FILE
Doc Date
8/4/2011
Doc Name
ConocoPhillips Concurrence
From
Chevron
To
ConocoPhillips
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chevron <br />August 4, 2011 <br />Mr. Dom Berta <br />ConocoPhillips <br />600 N. Dairy Ashford <br />Houston, TX 77079 <br />Re: ConocoPhillips concurrence for permitting and redassification of Red Point Mine to allow <br />for minor structural enhancements safety improvement <br />Dom <br />Greg Minnery <br />Oil Shale Manager <br />MidContinent/Alaska SBU <br />Chevron North America <br />Exploration and Production Company <br />(A Chevron U.S.A. Inc. Division) <br />1400 Smith Street, Houston, TX 77002 <br />P.O. Box 2100, Houston, TX 77252 -2100 <br />Tel 713 - 372 -2371 <br />Fax 866- 453 -5090 <br />minnery@chevron.com <br />2 / / 6 <br />As discussed with you previously, Chevron is moving ahead with plans to refurbish and re- <br />stabilize portions of the Red Point Mine near Debeque, Colorado. Red Point Mine is in very <br />good condition considering the 25+ years since it has been idle, but some areas have been <br />recommended for scaling (removing loose rock) and re- shoring (adding roof bolts) to reduce <br />hazards associated with plans for mine experimentation in 2012. The mine restoration will <br />include both interior and exterior work and will be paid for by Chevron. <br />The exterior work will include rock scaling above the mine portal, installation of a rockfall barrier <br />and rockfall mesh drape, and rehab of the wooden portal canopy. The mine interior work will <br />include scaling, installation of additional roof bolts and chain link fencing, and replacement of <br />utility piping and ventilation fans. We would like to begin this work in the coming weeks and <br />complete as much as possible in 2011. <br />The Mining Safety and Health Administration (MSHA) will require a change in mine classification <br />from abandoned to operational — non - producing to allow for any future experimentation, and <br />the Division of Reclamation and Mining Safety (DRMS) will require the work to be permitted <br />through a Notice of Intent. Chevron requests concurrence from ConocoPhillips to proceed with <br />these MSHA and DRMS requirements. <br />Sincerely <br />
The URL can be used to link to this page
Your browser does not support the video tag.