Laserfiche WebLink
OBSERVATIONS <br />PERMIT #: P -2011 -026 <br />INSPECTOR'S INITIALS: THM <br />INSPECTION DATE: July 17, 2012 <br />This inspection was conducted as part of the normal monitoring program established by the Colorado Division <br />of Reclamation, Mining and Safety (DRMS). <br />This inspection was to observe the conditions at the site and determine if the complete release request submitted <br />July 11, 2012 was approvable. <br />The only activities that occurred at the site were site stability and updating to the entrance of the mine. No new <br />surface disturbance is associated with this NOI. The operator wishes to maintain access to the site for future <br />potential experimental purposes. <br />The request for a complete release is approvable and an approval letter will be sent to the operator under <br />separate cover. <br />Responses to this inspection report should be directed to Travis Marshall at the Division of Reclamation, <br />Mining and Safety, Grand Junction Field Office, 101 South 3Id Street, Room 301, Grand Junction, Colorado <br />81501, phone no. (970) 241 -2042. <br />Page 2 of 3 <br />