My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINIMUM AVERAGE ROLL VALUES FOR <br />GEOTEXTILE MATERIAL <br />Property <br />ASTM Test <br />Method <br />Value <br />Weight (oz. /sq. yd.) <br />D 5261 <br />11.9 <br />Puncture (lbs.) <br />D4833 <br />130 <br />AOS <br />D4751 <br />No. 80 to 140 Sieve <br />PART 3: EXECUTION <br />3.01 INSTALLATION <br />A. Geotextile Deployment <br />Section 02777 <br />Geotextile <br />2. Rolls shall be free of holes, contamination, and foreign matter. <br />ame0 <br />3. The geotextile supplied for the project shall meet or exceed the minimum (unless noted <br />otherwise) roll values shown in the table below: <br />CONTRACTOR shall handle geotextile in a manner to ensure that geotextile is not damaged, and <br />shall comply with the following: <br />1. No equipment or tools shall damage the geotextile by handling, trafficking, or other means. <br />2. No personnel working on the geotextile shall smoke, wear damaging shoes, or engage in <br />other activities that could damage the geotextile. <br />3. Cross seams between two (2) panels of geotextile shall be staggered by a minimum distance <br />of five (5) feet on slopes greater than ten percent (10 %). <br />4. In the presence of wind, all geotextiles shall be weighted with sandbags or the equivalent. <br />Such sandbags shall be installed during deployment and shall remain until replaced with <br />cover material. <br />5. Geotextile panels shall be deployed in such a manner as to preclude wrinkles and folds. Any <br />wrinkle or fold that may manifest itself into other geosynthetic layers shall be removed. <br />6. Geotextile within the lined area shall be cut with a cutter approved by CERTIFYING <br />ENGINEER, such as scissors. Unshielded razor knifes are not acceptable. <br />7. Take necessary precautions to prevent damage to the underlying subgrade during placement <br />of the geotextile. <br />8. During placement of geotextiles, care shall be taken not to entrap, in or beneath the <br />geotextile, stones, excessive dust, or moisture that could damage the underlying or overlying <br />geomembrane, cause clogging of drains or filters, or hamper subsequent seaming. <br />9. Following the installation of all geotextile, an examination of the entire surface shall be <br />conducted to detect potentially harmful foreign objects. Any such foreign objects found <br />S• \Projects \1125E CCV CQA \I - Tech Specs \02777 r1 doc <br />Page 4 of 5 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.