My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 02776.1 <br />Geogrid <br />ame0 <br />3. CONTRACTOR shall repair damage resulting from handling and transport of geogrid at no <br />additional cost to CC &V. If irreparable, in the opinion of CERTIFYING ENGINEER, <br />damaged materials shall be replaced at no additional cost to CC &V. <br />C. Storage and Protection <br />1. MANAGER will provide area for on -site storage of the geogrid rolls from time of delivery <br />until installation. <br />2. The storage and handling of the materials is the responsibility of CONTRACTOR from the <br />time the materials are manufactured until the time the completed installation is accepted. <br />CONTRACTOR is responsible for preparing the storage location and for the protection of <br />the materials from the elements (e.g. ultraviolet light, moisture, temperature, etc.). <br />3. After CONTRACTOR has removed material from storage, CONTRACTOR shall protect <br />geogrid from puncture, dirt, grease, water, moisture, mud, mechanical abrasion, excessive <br />heat, and other sources of damage. <br />4. CONTRACTOR shall preserve integrity and readability of the geogrid roll labels, and store <br />the rolls such that MANAGER and CERTIFYING ENGINEER have access to the <br />package slips or roll labels for each roll to verify roll acceptance. <br />5. The rolls shall be stored on a prepared surface (not wooden pallets) and should not be <br />stacked more than two rolls high. <br />S: \Projects \1125E CCV CQA \I - Tech Specs \02776 1r1 doc <br />Page 3 of 6 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.