My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-12-27_REPORT - M1980244 (17)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-12-27_REPORT - M1980244 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:11:41 PM
Creation date
1/8/2013 12:22:20 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
12/27/2012
Doc Name
QA Mon. & Test Results, Ph. 5 Berm Mod.-Apend. E Specs.
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. Extend geomembrane into the anchor trench as shown in the DRAWINGS. The geomembrane <br />shall be seamed along the entire distance of the anchor trench to the termination of the <br />geomembrane sheet. <br />3.04 PROTECTION <br />Section 02776 <br />Geomembrane <br />CONTRACTOR shall be responsible for the following: <br />A. Do not use equipment or tools, which damage the geomembrane by handling, trafficking, excessive <br />heat, leakage of hydrocarbons, or other means. <br />B. Ensure prepared surface underlying geomembrane has not deteriorated since previous acceptance, <br />and remains acceptable until acceptance by CC &V, as detailed in Section 3.02. <br />C. Keep geotextile elements immediately underlying the geomembrane clean and free of debris. <br />D. Do not permit personnel to smoke or wear damaging shoes while working on geomembrane. <br />E. Unroll panels in a manner, which prevents scratches or crimps in geomembrane and does not <br />damage supporting Soil Liner Fill. <br />F. Place panels in a manner that prevents wrinkles (especially differential wrinkles between adjacent <br />panels). <br />G. Prevent wind uplift and damage to geomembrane subgrade by providing temporary and permanent <br />loading and/or anchoring that will not damage geomembrane. <br />H. Minimize direct contact of equipment and personnel with geomembrane. <br />I. Protect geomembrane in areas where excessive traffic is expected with geotextiles, extra <br />geomembrane, or other materials acceptable to MANAGER, DESIGN ENGINEER, and <br />CERTIFYING ENGINEER. <br />3.05 FIELD PANEL DEPLOYMENT <br />A. CONTRACTOR shall install field panels at locations indicated on CONTRACTOR's layout <br />plan, as approved by MANAGER, DESIGN ENGINEER, and CERTIFYING ENGINEER <br />B. CONTRACTOR shall replace damaged (i.e., torn, twisted, or crimped) field panels, or portions <br />thereof, at no cost to CC &V. CONTRACTOR shall repair less serious damage according to <br />Article 3.10 of this Section, at no cost to CC &V. CERTIFYING ENGINEER shall determine if <br />material is to be repaired or replaced. <br />C. CONTRACTOR shall remove damaged panels, portions of damaged panels, and other <br />geomembrane scrap. <br />D. CONTRACTOR shall not deploy more geomembrane field panels in one day than can be seamed <br />during the day of deployment. <br />E. Geomembrane deployment shall proceed between ambient temperatures of fourteen degrees (14° <br />F) Fahrenheit to one - hundred degrees (100 ° ) Fahrenheit. Geomembrane placement shall not be <br />C \AMEC_CC &V\Phase 5 VLF \PSSA Cert Report\Appendices\Appendix E \SPECS \02776 r1 doc <br />Page 14 of 22 September 3, 2008 <br />Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.